Laserfiche WebLink
<br />City of Arden Hills <br />March 2008 <br /> <br />IX. Schedule <br /> <br />A. 2008 Plan <br />o Install flow meters for peak wet weather period to attempt to capture several rainfall events <br />o Calibrate pumps at each of the collection system lift stations <br />o Evaluate flows from each lift station area and compare to flows at temporary meters and MCES <br />flow meters. <br />o Conduct physical survey of manholes located in "off-road" locations <br />o Complete rehabilitation of any identified manhole inflow sources <br />o Experiment with televising sewer service lines in 10 - 20 locations <br /> <br />B. 2009 Plan <br />o Conduct sump pump surveys of 50 % of the sewer service area. <br />o follow up on sewer service line inspection based on experience from 2008 <br />o Evaluate flows throughout system using lift station metering points and MCES Meters <br />o <br /> <br />C. 2010 Plan <br />o Conduct sump pump surveys of remaining 50% of the sewer service area <br />o Evaluate flows throughout system using lift station metering points and MCES Meters. <br />o Consider sewer replace programs if defective services are identified. <br /> <br />D. 2011 Plan <br />o Complete any remaining rehabilitation projects <br /> <br />Page 11 of 12 <br />