Laserfiche WebLink
<br />RAMSEY COUNTY PROJECT <br /> <br />II. Grade separation of Highway 10 and County Road 96 <br /> <br />The City understands that grade separation of these two roadways is proposed to address <br />safety and traffic operational issues. Due to these improvements, some properties may be <br />negatively impacted and the City wants to assure that all measures to reduce the impacts are <br />undertaken. <br /> <br />o DESIGN CONSTRAINT #1 <br /> <br />Mitigate noise impacts to residential areas located south of County Road 96. <br /> <br />o CITY PERSPECTIVE <br /> <br />Due to grade separation, the City is concerned that noise levels may increase for these <br />residential areas. The City would like to review mitigation measures _,mg___(:_Q5t~.to see if <br />noise can be reduced through noise walls, landscaping and/or paving and views that cost <br />of noise mitigation is the responsibility of MnDOT and Ramsey County. <br /> <br />o DESIGN CONSTRAINT #2 <br /> <br />Review need to provide an exit ramp from north bound Highway 10 onto east bound <br />Counly Road 96. <br /> <br />o CITY PERSPECTIVE <br /> <br />City would like to provide better local access onto County Road 96. if it makes financial <br />sense, due to the proposed elimination of Interstate 694 exit onto Hamline A venue. <br /> <br />o DESIGN CONSTRAINT #3 <br /> <br />Minimize impacts to Arden Manor by COfLsid~iDg_minimjzing median_ shoulder. <br />boulevard, sidewalk and trail widths on north and south side of County Road 96. <br /> <br />o CITY PERSPECTIVE <br /> <br />City would like to preserve as many homes along County Road 96 as possible and local <br />decisions on medians. shoulders, boulevards. sidewalk and trail widths and location of <br />traiI(s) on one or both sides of the roadway may be ways to assist in meeting this goal. <br />The City also understands that appropriate turn lanes, alignments with bridges and other <br />traffic flow and safety issues need to be adequately addressed in the design and may <br />dictate certain elements of the road layout. <br /> <br />o DESIGN CONSTRAINT #4 <br /> <br />Utilize existing southern edge of County Road 96 as future edge of all improvements <br />and for future alignment oflnterstate Highway 35 bridge expansion. <br /> <br />o CITY PERSPECTIVE <br /> <br />City would like to preserve as many homes along County Road 96 as possible and if the <br />alignment can meet engineering standards by having County Road 96 located as far <br />south as possible, that would be preferred. <br />