My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, I&I Work Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
04-14-08-R
>
4D, I&I Work Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2008 11:22:49 AM
Creation date
4/11/2008 11:20:33 AM
Metadata
Fields
Template:
General
Document
I&I Work Plan
General - Type
Agenda Item
Date
4/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />April 10, 2008 <br /> <br />AGENDA ITEM <br /> <br />TO: <br /> <br />Mayor and City Council <br />Jim Willis, Interim City Administrator <br /> <br />FROM: <br /> <br />Kristine Giga, Civil Engineer <br />Greg Hoag, Public Works Director <br /> <br />SUBJECT: <br /> <br />Approve the Inflow and Infiltration (1&1) work plan for 2008 and <br />authorize staff to contract with Bonestroo to perform additional study <br />for the City in an amount not to exceed $18,300. <br /> <br />BACKGROUNDIDISCUSSION <br /> <br />On March 31, 2008, staff presented the City Council with the Inflow and Infiltration (1&1) report <br />prepared by Bonestroo, which discussed initial results of the study and recommended next steps. <br />At this time, staff is presenting the City Council with a work plan for 2008. Additional study is <br />needed to better understand the source(s) of the 1&1. Without this knowledge, we cannot <br />confidently recommend an additional 1&1 reduction program to the City Council. Once this is <br />completed, staffwill identify improvement projects for 2008 to reduce the 1&1 entering the <br />sanitary sewer system; these projects will be brought to the City Council for approval. <br /> <br />Additional temporary flow meters: Three temporary flow meters are proposed for 2008 in the <br />same locations as 2007 (see attached map); we would like to supplement the data that was <br />collected last year. We anticipate the meters will be in place for four to six weeks, depending on <br />the weather. The meters need to monitor "normal flow" and "high flow". High flow occurs <br />when we receive significant rain events. However, if we have a drier than normal period, the <br />length of time the meters are in place may need to be extended. Flow meter installation will <br />occur in the next few weeks. <br /> <br />Calibrate lift stations: Public Works staffwill calibrate the lift stations (establish pump cycle <br />times) to supplement the data collected from the flow meters. In addition to this work, we would <br /> <br />\\Metro-inet.us\ardenhil1s\PR&PW\Engineering\2008\Council_ Actions\4-14-08MemoI&I.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.