Laserfiche WebLink
<br />April 9, 2008 <br /> <br />Table 2 - Highway 10 Alignment Feasibility Study - Cost Comparison <br /> <br /> EACH $65,000 15 $975,000 10 $650,000 5 $325,000 <br /> ACRE $200,000 4.94 $988,000 3.84 $768,000 1.69 $338,000 <br /> EACH $800,000 1 $800,000 1 $800,000 1 $800,000 <br /> EACH $221,500 6 $1,329,000 6 $1,329,000 6 $1,329,000 <br /> West RIW Subtotal $4,092,000 $3,547,000 $2,792,000 <br />CAAP RIW 1m acts ACRE $200,000 4.82 $963,714 4.82 $963,714 7.96 $1,592,277 <br />dditional East side RIW Impacts ACRE $200,000 0.00 $0 0.00 $0 0.00 $0 <br /> East RIW subtotal $963,714 $963,714 $1,592,277 <br />Groundwater monitorin s stem wells LS 1 $563,520 1 $563,520 1 $1,182,240 <br />Construction Cost N/A N/A $15,750,000 $23,083,000 $23,733,000 <br /> Total Cost $21,400,000 $28,200,000 $29,300,000 <br /> <br /> <br />Alternate 1 <br />Existing Alignment <br /> <br />Alternate 2 <br />Shift South Bound Lanes Only <br />(Urban Road Section) <br /> <br />Alternate 3 <br />Shift Both Road Beds East Within <br />ROW (Urban Road Section) <br /> <br /> Alternate 4 <br />Shift Entire Road East to Avoid All <br />Arden Manor Impacts (Rural Road <br /> Section) <br />Number of Units Total Cost <br />Affected <br />0 $0 <br />0 $0 <br />0 $0 <br />0 $0 <br /> $0 <br />21.69 $4,337,071 <br />7.19 $1,438,264 <br /> $5,775,335 <br />1 $2,252,160 <br /> $25,418,000 <br /> $33,400,000 <br /> <br /> <br /> <br />Notes: <br />1. All numbers are estimates at this time and will be updated based upon actual costs determined at the time the project is undertaken <br />2. Unit Costs for manufactured homes includes acquisition/relocation of home and residents and reestablishment fees <br />3. Unit cost for single-family homes and Big Ten include acquistion, relocation demolition and soft costs <br />4. If it is determined in the future that the exisiting Highway 10 pavement will require an overlay, the cost is $ 1 million per mile for a 4-lane road <br />5. No cost has been assumed for RIW acquisition associated with stormwater ponding <br />6. Includes cost of the Highway 10 bridges over Highway 96 <br />7. The additonal taking of TCAAP land in Alternates 3 and 4 will reduce the development program effecting the amount of commerical development at TCAAP and has not been quantified in this estimate. <br />