My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A, Approve PC 08-005 for Traverse Business Ctr
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
04-28-08-R
>
7A, Approve PC 08-005 for Traverse Business Ctr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2008 11:05:43 AM
Creation date
4/25/2008 11:02:12 AM
Metadata
Fields
Template:
General
Document
PC 08-005 Traverse Bus Ctr
General - Type
Agenda Item
Date
4/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />be effective until temporary utility easements are conveyed subject to <br />review and approval by the City Engineer and City Attorney. <br /> <br />6.0 Vacation of Street. Concurrent with the approval of the Replatting <br />Application, the City shall adopt a resolution vacating the following <br />public right~of~way: <br /> <br />All of 3'd Ave. NE and 13th St. NE as dedicated in the plat of the <br />northeast corner addition according to the recorded plat thereof, <br />Ramsey County, Minnesota. <br /> <br />The resolution vacating the streets described herein shall not be <br />effective until temporary utility easements are conveyed subject to <br />review and approval by the City Engineer and City Attorney. <br /> <br />7.0 Park Dedication Requirement. CMK shall satisfy the City's park <br />dedication requirement in the following manner: <br /> <br />A. On~Site Improvements. Prior to issuance of occupancy permits, <br />CMK shall construct an on~site pathway improvement as proposed <br />in its March 25, 2008 plan. The estimated cost of the on~site <br />improvement is $153,400. On~site pathway improvement plans <br />shall be reviewed and approved by the City Planner and the City <br />Engineer. The form of the temporary easement shall be approved <br />by the City Attorney. The on~site pathway improvement plans <br />may be modified by the City Planner and the City Engineer, <br />provided that such modifications do not reduce the value of the <br />on~site improvements. <br /> <br />B. Gatewav Boulevard Improvements/Securitv. Prior to the issuance <br />of occupancy permits, CMK shall construct an eight (8) foot <br />concrete pathway along Gateway Boulevard pursuant to plans and <br />specifications reviewed and approved by the City Engineer and <br />Public Works Director. CMK shall be responsible for all site <br />preparation, grading, relocationlreplacement of city signs, site <br />restoration, and other work related to the pathway. The <br />estimated cost of the Gateway Boulevard pathway improvements <br />is 126,600. CMK shall provide a one year warranty for such <br />improvements security in the form of cash or a letter of credit <br />equal to 125% of the estimated cost of the Gateway Boulevard <br />pathway improvements. The form of security shall be approved <br />by the City Attorney. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.