Laserfiche WebLink
City of Arden Hills Chapter 13 Zoning Code <br />A. The drive-in business or fast food restaurant operation is an integral <br />part of a building containing one or more allowed uses and the drive-in <br />business or fast food restaurant is clearly secondary to other principal uses <br />in the building. <br />B. The architectural treatment, circulation plan and signage system of <br />such drive-in business or fast food operations are designed to be visually <br />and functionally an integral part of the building and site in which they are <br />located. <br />Subd.5 District Requirements. The requirements below are established for <br />development of individual "lots" and for the overall development of "planned <br />projects". "Lots" are individual parcels on which may be placed a single building <br />(either single or multiple -occupancy). 'Planned projects" are sites on which may be <br />placed (a) A single or multi -occupancy retail center; (b) Two or more free-standing, <br />single or multiple -occupancy buildings; or (c) A combination of (a) and (b). <br />A "retail center" is a single building housing either several retail outlets or a single <br />retail outlet with several departments. In a "planned project" individual lots may be <br />created for separate buildings or parts of buildings but separate buildings are not <br />required to be located on separate lots. To allow maximum development creativity <br />and flexibility, regulations such as lot area, side and rear yard building and parking <br />setbacks, Floor Area Ratio (F.A.R.), number of parking spaces, percent of landscape <br />area, etc., may be modified for individual parcels and interior lot lines within a <br />project. However, the regulations for these same items must be met for the total <br />project area and exterior project lot lines. <br />A. Minimum Lot Area Requirements: <br />1. Multiple -occupancy retail center: 5 acres <br />2. Free-standing, single or multiple -occupancy building: 2 Acres <br />B. Maximum Bulk Requirements: <br />1. Height: 35 feet <br />2. Floor area ratio (F.A.R.): .30 <br />3. Lot coverage by structure: 25% <br />C. Minimum Landscaped Area: 25% <br />D. Minimum Building Setbacks: <br />Section 1320 & 1325 — Regarding Landscape Requirements <br />Adopted: April 28, 2008 <br />Page 5 of 31 <br />