My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-07-08-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2008
>
05-07-08-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 1:28:29 PM
Creation date
5/1/2008 2:01:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Hills - Comprehensive Plan - DRAFT <br />The forecasted 2030 average annual daily traffic volumes are illustrated in Figure <br />4.7 — 2030 Forecasted Average Daily Traffic Volumes and also in Appendix D. <br />The following roadway improvements that directly impact Arden Hills are in the <br />State and County Transportation Improvement Programs: <br />2009: CSAH 96 from Old Highway 8 to TH 10 - Reconstruction <br />2012: 1-694 from East of 1-35W to East of Lexington Avenue — Grading, <br />surfacing, and improvement from a 4 -lane freeway to a 6 -lane freeway and <br />correction of weave at TH 10/51 <br />Deferred from Ramsey County 5 -Year TIP: County Road D from Cleveland <br />Avenue to Fairview Avenue - Reconstruction <br />The forecasted average annual daily travel demands approach or exceed daily <br />capacities on several corridors. Based on 2030 traffic projections, the following <br />roadways are anticipated to be periodically congested, near congested, or <br />congested: <br />Level of Service C — Periodically Congested <br />• TH 10 from CSAH 96 to 1-694 <br />• CSAH 51/1-exington Avenue from CSAH 96 to CR F <br />• CSAH 51/Lexington Avenue, North of Tanglewood Drive <br />• CSAH 96, East of TH 10 <br />• CR E from TH 51 to CSAH 51/1-exington Avenue <br />• CR E from CSAH 76/Snelling Avenue to CR 99 <br />• CR E2 from CSAH 76/Snelling Avenue to 1-35W <br />• CR I from 1-35W to CSAH 51/1-exington Avenue <br />Level of Service D & E — Near Congested <br />• <br />1-694 from 1-35W to TH 10 <br />• <br />TH 10 from CSAH 96 to 1-35W <br />• <br />TH 51 from 1-694 to CR E <br />• <br />TH 51, South of CSAH 50/Hamline Avenue <br />• <br />CSAH 50/Hamline Avenue from CSAH 96 to 1-694 <br />• <br />CSAH 51/1-exington Avenue from Tanglewood Drive to CSAH 96 <br />• <br />CSAH 51/1-exington Avenue, South of CR F <br />• <br />CSAH 76/Snelling Avenue from CR E2 to CR E <br />• <br />CSAH 96 from 1-35W to TH 10 <br />• <br />CR D froml-35W to CSAH 149/Lake Johanna Boulevard <br />• <br />CR E from TH 51 to CSAH 76/Snelling Avenue <br />DRAFT <br />5/1/2008 <br />9F <br />i Formatted: Font: (Default) Arial, 10', <br />Pt <br />! Formatted: Font: (Default) Arial, 10 <br />pt <br />
The URL can be used to link to this page
Your browser does not support the video tag.