My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1B - 2008 Utility Rate Study
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
05-19-08-WS
>
1B - 2008 Utility Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 2:46:50 PM
Creation date
5/15/2008 2:44:16 PM
Metadata
Fields
Template:
General
Document
2008 Utility Rate Study
Date
5/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> associated with the water treatment annually <br /> olan exoansion <br />Capital Costs of improvements are inflated Costs of improvements are inflated <br />Expenses 3 % per year. 3% per year. Future total capital <br /> Future total capital improvements improvements from 2009 to 2018 are <br /> from 2009 to 2018 are estimated at estimated at an inflated value of $2M <br /> an inflated value of$2.2M over the for the next 10 years. <br /> next 10 years. <br /> Minimal debt is expected to be <br /> Minimal debt is expected to be incurred. <br /> incurred. <br />Rate Structure Current billing structure is a fixed Currently residents are billed year- <br /> rate 01'$2.86 per 1,000 gallons for round based on water consumption at <br /> usage over the 10,000 gallons per $3.24 per 1,000 gallons over a base <br /> quarter base, and a base meter usage of 15,000 gallons. The base <br /> charge 01'$29.22. Seniors are billed meter charge is $67.83 per quarter. <br /> at $2.93 per 1,000 gallons with no Seniors are billed at a base rate of <br /> base meter charge. Additionally, $45.20 with no additional usage <br /> there is a residential stand by charge charge. <br /> of $6.60 per quarter for residential <br /> accounts. <br /> Two of the proposed rate structures <br /> on Appendix F move to a three- <br /> tiered rate svstem for all users. <br />Development The City currently does not charge The City currently does not charge a <br />Fees area fees for development. The City sewer area fee for development. <br /> currently charges a water <br /> connection fee of $80 per <br /> connection. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.