<br />Page 4 of5 <br />However, it was recommended at that time that a study of the entire drainage area be <br />considered in order to get a comprehensive understanding of the park and surrounding <br />neighborhoods. A drainage study of the area would model the existing conditions to <br />identify the extent of flooding in problem areas during various rain events. The study <br />would also include an analysis of modifications and/or improvements needed to the <br />existing system to correct drainage problems. Results of the study will assist staff in <br />determining the most cost effective way to incorporate recommended drainage <br />improvements into nearby PMP projects. <br /> <br />Staff did budget $20,000 for this stand alone study in 2008. Staff is planning to go <br />out for Requests for Proposals from the engineering pool for this project sometime in <br />August. <br /> <br />Assessments - This year, Mini Mobile who had provided our mobile warming house in <br />200512006, calIed one week before the season was to begin to inform us that they did not <br />have a unit for us. Therefore, staff was forced to contract with SateIIite for a different <br />office at a total cost of $2,066.32. The stair unit on the building did sustain damage over <br />a weekend during the season and the cost to fix it was $400.20. Therefore, without the <br />damages, the total rental fee was: $1,666.12. This amount was over budget by $366.12 <br />due to the change in companies. Although this mobile unit was sufficient, it did have <br />stairs which are not ideal for an ice rink building. The access to the rink is not an ideal <br />situation at this rink. This wilI need to be addressed before the flooding begins next <br />season. <br /> <br />RINK MAINTENANCE <br />The rink maintenance procedures were reevaluated and restructured with very positive results in <br />2006/2007. These procedures remained the same this past season: <br /> <br />Preseason - The flooding schedule was scheduled as a shift change versus paid overtime. <br />Overnight flooding took place for the preseason with a two person crew. <br /> <br />Regular season - Flooding crews were occasionaIIy scheduled to start 2-3 hours before <br />normal shift hours. This results in better flooding conditions and better ice conditions. <br /> <br />The consistent cold weather this past winter made the ice conditions ideal throughout the entire <br />season. Our Public Works Department did a fabulous job of maintaining the rinks and should be <br />commended. <br /> <br />RECOMMENDATION FOR 2007/2008 SEASON <br />Outdoor rink usage has gone down in the last five years. At some point, the City Council may <br />want to consider reducing the number of rink sites. <br /> <br />\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\warming house Review <br />08.DOC <br />