My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 7B, T-Mobile Cell Antennas
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
05-27-08-R
>
Item 7B, T-Mobile Cell Antennas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2008 4:31:40 PM
Creation date
5/22/2008 4:29:48 PM
Metadata
Fields
Template:
General
Document
T-Mobile Cell Antennas
General - Type
Agenda Item
Date
5/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: May 27, 2008 <br /> <br />TO: Mayor & City Council <br /> <br />FROM: Meagan Beekman, Planner I <br />James Lehnhoff, City Planner <br /> <br />SUBJECT: Planning Case #: 08-007 <br />Conditional Use Permit <br />T-Mobile (paul Harrington) <br />4251 Fernwood Street <br /> <br />Request <br /> <br />1. Approve Planning Case 08-007 for a Conditional Use Permit for T-mobile Cellular Antennas <br />on the City Water Tower with at 4251 Femwood Street Based on the Findings of Fact and the <br />Submitted Plans as Amended by the Ten Conditions in the May 27, 2008, Memo to the City <br />Council. <br /> <br />2. Authorize Staff to Negotiate the Lease Agreement between T-Mobile Communications and <br />the City of Arden Hills with a Yearly Lease Rate of $ with a Yearly Increase of _%. <br /> <br />Backl!round <br /> <br />The applicants have requested a conditional use permit (CUP) to install nine panel antennas on to <br />the stem ofthe City water tower located at 425 I Femwood Street (north water tower). Three of <br />the antennas will be at a height of73 feet and six will be at a height of 83 feet. <br /> <br />Immediately to the east of the tower is an existing equipment building that houses the ground <br />equipment for the antennas that are currently located on the water tower. The existing ground <br />structure is at capacity; however, the water tower itself is capable of accommodating additional <br />antennas and there is sufficient land to accommodate additional ground equipment. T-Mobile is <br />proposing to construct a new, 360 square foot equipment building to house the ground equipment <br />for the proposed antennas. This building would be located to the north of the tower, across the <br />access road to the site. <br /> <br />\\Metro~inet.us\ardenhills\Planning\Plallning Cases\2008\OB-007 T~Mobile CUP (PC Approved)\052708 - CC Report - T-mobile CUP.doc <br />Page 1 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.