My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 7B, T-Mobile Cell Antennas
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
05-27-08-R
>
Item 7B, T-Mobile Cell Antennas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2008 4:31:40 PM
Creation date
5/22/2008 4:29:48 PM
Metadata
Fields
Template:
General
Document
T-Mobile Cell Antennas
General - Type
Agenda Item
Date
5/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ms. Beekman reported that the applicant submitted a Conditional Use Permit to <br />instaII nine panel antennas on the stem of the City water tower located at 4251 <br />Femwood Street at a maximum height of 83 feet. In order to accommodate the <br />ground equipment for the new antennas, T-mobile is proposing to construct a 360 <br />square foot building adjacent to the water tower that would be given to the City <br />upon completion. She then provided backgronnd information and said Staff <br />recommends approval subject to the following ten conditions. <br /> <br /> <br />March 5, 2008, Planning Commission Meeting <br />DRAFT Meeting Minutes <br /> <br />PLANNING CASE # 08-007 - CONDITIONAL USE PERMIT; T-MOBILE <br />COMMUNICATIONS; 4251 FERNWOOD STREET- PUBLIC HEARING <br /> <br />1. The project shall be completed in accordance with the plans submitted as <br />amended by the conditions of approval. Any significant changes to these <br />plans, as determined by the City Planner, shall require review and approval by <br />the Planning Commission and City Council. <br /> <br />2. The antennas and all mounts shall be painted to match the color of the water <br />tower. <br /> <br />3. Upon removal of any equipment the applicant shall repair all holes, scratches, <br />rust, or damage to the tower caused by the supports from these antennas and <br />the tower shall be repainted the primer and matching paint to ensure that the <br />metal is protected. <br /> <br />4. All cables associated with this project shaII be properly secured and will not <br />impede the use of the access tube to the water tower. <br /> <br />5. A building permit shaII be obtained for all proposed antennas pnor to <br />installation. <br /> <br />6. A building permit shall be obtained for all proposed structures pnor to <br />installation. <br /> <br />7. The equipment building shall be constructed by T-Mobile and given to the <br />City upon completion. <br /> <br />8. Antennas shall not be instaIIed and building permits shall not be issued until a <br />lease agreement is approved by the City Council. <br /> <br />9. Any termination of the lease agreement will lead to a termination of the <br />Conditional Use Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.