My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 8A, Update on Interstate 694, Hwy 10, and CR 96
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
05-27-08-R
>
Item 8A, Update on Interstate 694, Hwy 10, and CR 96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2008 4:32:41 PM
Creation date
5/22/2008 4:30:04 PM
Metadata
Fields
Template:
General
Document
Update on I-694, Hwy 10, CR 96
General - Type
Agenda Item
Date
5/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City or Arden Hills <br />May 21,2008 <br />Page 2 of2 <br />Phasing or the TH 10 Local Access Interchange considered postponing construction or the southbound <br />exit ramp and west frontage road connection to CR 96. These phasing options would delay impacts to <br />Arden Manor properties. <br /> <br />Under this analysis, peak hour tramc conditions would become problematic at the 1-35W/CR 96 <br />interchange wi!.h a partial build of the 'I'll 10 Local Access Interchange. TroDie flow that currently <br />travels south on '1'1-110 to east on CR 96 would necd to divert to the 1-35W/CR 96 interchange or othcr <br />local routes. Growth in background traffic and new trips associated with the TCAAP site would increase <br />travel demand for this critical movement. Even with signalization orIhe ramp intersections, unacceptable <br />delays would be experienced for traffic exiting southbound 1-35W at CR 96. The southbound TH ] 0 exit <br />to the Local Access interchange, along with the west frontage road connection to CR 96, arc critical <br />clements necessary to maintain acceptable traffic operations. <br /> <br />H.ccommendations <br />We reeolllmend the City of Arden I-Jills endorse the rull constnletion or the TH 10 Local Access <br />Interchange and West Frontage Road to CSAI-I 96 by 2012 with initial phase of the TCAAP development <br />and grode separation ofTH 10/CSAH 96. Phasing of access at this location would result in unacceptable <br />traffic operations at nearby intersections. This may require temporary improvements to mitigate <br />unacceptable traffic operations and result in higher project costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.