My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Code of Ordinances
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
1970-1979
>
1979
>
Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2008 5:40:29 PM
Creation date
5/22/2008 3:01:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> i <br /> <br /> BUILDINGS § 6-197 <br /> <br /> surface through the glacial drift and into the Platteville <br /> Limestone. A nominal five (5) inch (minimum) open hole <br /> shall then be drilled through the undesirable formations and <br /> at least twenty (20) feet into the continuous nonfaulty <br /> consolidated St. Peter Sandstone and/or at least twenty (20) <br /> feet below the pumping water level whichever is lower. A <br /> minimum four (4) inch liner ahall then be installed from the <br /> surface to the bottom of the five (5) inch hole, and the <br /> bottom ten (10) feet shall be grouted in place. The nominal <br /> four (4) inch open hole shall be continued into the water- <br /> bearing formation such diatance as is necessary to provide <br /> the required water supply. In case of wells larger than four <br /> (4) inchea, all other component parts of the well shall be <br /> constructed proportionately. (Ord. No. 56, § 4-5, 9-12-60) <br /> <br /> <br /> ~ <br /> <br /> <br /> i <br /> i <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> [The nezt page ia 3971 <br /> 347 <br />
The URL can be used to link to this page
Your browser does not support the video tag.