Laserfiche WebLink
<br /> <br /> i <br /> <br /> FLOODPLAIN MANAGEMENT § 9.5-61 <br /> <br /> (including basement) of all new structures or additions to <br /> existing structures in the floodplain districts. He/she shall <br /> also maintain a record of the elevations to which structures <br /> or additions to structures are floodproofed. (Ord. No. 218, § <br /> 7(D), 5-26-81) <br /> Secs. 9.5-45-9.5-50. Reserved. <br /> <br /> AR.TICLE V. SUBDIVISIONS AND MOBILE <br /> HOME PAR,KS <br /> <br /> Sec. 9.5-51. Construction in subdivisions. <br /> All lots subdivided within any floodplain district shall <br /> contain a building site at or above the regulatory flood <br /> protection elevation. All subdivisions shall have water and <br /> sewage facilities that comply with the provisions of the <br /> floodplain management ordiance [this chapter], and have <br /> road access both to the subdivision and to the individual <br /> building sites no lower than two (2) feet below the regulatory <br /> flood protection elevation. (Ord. No. 218, § 8, 5-26-81) <br /> Sec. 9.5-52. New and egisting mobile home parks. <br /> New mobile home parks and expansions to existing <br /> mobile home parks shall be subject to the provisions placed <br /> on subdivisions by section 9.5-51 of this chapter. (Ord. No. <br /> 218, § 9, 5-26-81) <br /> Secs. 9.5-53-9.5-60. fteserved. <br /> <br /> <br /> AItTICLE VI. NONCONFORMING USES <br /> <br /> Sec. 9.5-61. Conditions for continuance; elimination. <br /> A structure or the use of a structure or premises which <br /> was lawful before the passage or amendment of this chapter <br /> but which is not in conformity with the provisions of this <br /> chapter may be continued subject to the following condi- <br /> tions: <br /> Supp. No. 3 <br /> 559 <br />