My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, Motion to Approve the June Quote from Pearson Mechanical
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
06-30-08-R
>
4D, Motion to Approve the June Quote from Pearson Mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2008 10:57:59 AM
Creation date
7/1/2008 10:56:09 AM
Metadata
Fields
Template:
General
Document
4D, Motion to Approve Quote - Pearson
Date
6/30/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~ <br /> <br /> <br />EN HILLS <br /> <br />MEl\tIORANDUM <br /> <br />DATE: <br /> <br />June 30, 2008 <br /> <br />TO: <br /> <br />Mayor and City Council <br />Ron Moorse, City Administrator <br /> <br />FROM: <br /> <br />Michelle Olson, Parks and Recreation Manager <br />Greg Hoag, Public Works Director <br />Dave Scherbel, Building Official <br /> <br />SUBJECT: <br /> <br />City Hall Building Systems <br /> <br />Requested Action <br />Motion to approve the June 4, 2008, Quote from Pearson Mechanical to Install a Cooling System <br />in the Audio Visual room for an Amount Not to Exceed $9,970.00. <br /> <br />Back{!round <br />The original design of the Audio Visual (A V) room's ventilation did not take into account the <br />large amount of heat generated from the equipment in that room. The cooling system is <br />inadequate for that large amount of heat being generated, which contributed to the failure of the <br />equipment in that space. <br /> <br />To help prolong the life of the current equipment and comfort level for the occupants, staff <br />obtained proposals from two Inechanical contractors. The contractors were requested to evaluate <br />the space and come up with the most economical solution to cool the A V room. Both contractors <br />suggested installing a split unit cooling system. The contractor would install an air conditioning <br />unit in the room and the condensing unit on the roof. <br /> <br />Quotes <br /> <br />Staff received two quotes for this project, \vhich are attached: <br />o Johnson Controls for $ 13,438.00 <br />o Pearson Mechanical for $9.,970.00. <br /> <br />C:\DoCUlnents and Settings\noah.sirTIon\Local SettingsTelnporary Inlelllet Files'OLK6C\City Hall A V room cooling (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.