My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7E, Erosion & Sediment Control Ordinance Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
07-14-08-R
>
7E, Erosion & Sediment Control Ordinance Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2008 8:54:37 AM
Creation date
7/14/2008 8:50:27 AM
Metadata
Fields
Template:
General
Document
7E, Erosion & Sediment Control Ordinance
Category
7E, Erosion & Sediment Control Ordinance
Date
7/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br /> <br />Chapter 15 Erosion and Sediment Control Ordinance <br /> <br />Subd.8 Street sweeping shall be used ifBMPs are not adequate to prevent sediment from <br />being tracked into the street. <br /> <br />1530.03 Responsibility. The Permittee shall be responsible for proper operation and maintenance of <br />all stormwater pollution controls and soil stabilization measures in conformance with best <br />management practices and with the maintenance requirements in the NPDES General Construction <br />Permit. The Permittee is responsible for the operation and maintenance of temporary erosion at the <br />site. The Permittee is responsible until another Permittee has assumed control over all areas of the <br />site that have not been finally stabilized or the site has undergone final stabilization, and has received <br />an approved Certificate of Completion. The Permittee is responsible for maintenance, clean-up and <br />all damages caused by flooding of the site or surrounding area due to in-place erosion or sediment <br />control. <br /> <br />Section 1540 - Enforcement <br /> <br />1540.01 Erosion and Sediment Control Permit Enforcement. Upon the receipt of a Non- <br />Compliance Notice from the PWD, the Permitee shall undertake a corrective action. <br /> <br />Subd. 1 Types of Corrective Actions. <br /> <br />A. For Violations Contained on the Construction Site. Permitee shall complete <br />clean-up and restoration within forty-eight (48) hours of receipt of the Non- <br />Compliance Notice. <br /> <br />B. For Violation Impacting Adjoining Property. Permitee shall develop and <br />complete a clean-up and restoration plan within forty-eight (48) hours of receipt of <br />a Non-Compliance Notice unless the affected adjoining property owner refuses <br />Permittee access to the adjoining property. In all cases, clean-up and restoration <br />shall be completed within seven (7) days of receipt of the Non-Compliance <br />Notice, unless an extension is granted by the PWD. <br /> <br />C. Violations Impacting Streets, Wetlands, or Water Bodies. Permittee shall develop <br />and implement a clean-up and restoration plan immediately upon receipt of a <br />Non-Compliance Notice. <br /> <br />Subd.2 Failure to Comply. If Permittee fails to implement the Plan or complete any <br />required corrective action in a timely manner, the City may pursue one or more of the <br />remedies specified herein. All costs incurred by the City shall be paid by Permittee. <br />Escrow funds may be used by the City for this purpose and, if such funds do not <br />adequately cover the City's cost, the Permittee shall reimburse the City for any deficiency <br />before continuing work on the construction site. The City may: <br /> <br />A. Withhold the scheduling of inspections and/or the issuance of a Certificate of <br />Occupancy. <br /> <br />B. Revoke any permit issued by the City to the Permittee for the Site. <br /> <br />1500 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.