My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7E, Erosion & Sediment Control Ordinance Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
07-14-08-R
>
7E, Erosion & Sediment Control Ordinance Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2008 8:54:37 AM
Creation date
7/14/2008 8:50:27 AM
Metadata
Fields
Template:
General
Document
7E, Erosion & Sediment Control Ordinance
Category
7E, Erosion & Sediment Control Ordinance
Date
7/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br /> <br />Chapter 15 Erosion and Sediment Control Ordinance <br /> <br />The Erosion and Sediment Control Plan shall address the following criteria: <br /> <br />A. Conform to the natural limitations presented by topography and soil so as to create <br />the least potential for soil erosion. <br /> <br />B. Stabilize all exposed soils and soil stockpiles; <br /> <br />C. Establish permanent vegetation; <br /> <br />D. Prevent sediment damage to adjacent properties and other designated areas; <br /> <br />E. Schedule of erosion and sediment control practices; <br /> <br />F. Use of temporary sedimentation basins; <br /> <br />G. Stabilization of steep slopes and bluffs; <br /> <br />H. Control the storm water leaving a site; <br /> <br />I. Stabilize all waterways and outlets; <br /> <br />J. Protect storm sewers and outfalls from the entrance of sediment, debris and trash; <br /> <br />K. Control waste, such as discarded building materials, concrete truck washout, <br />chemicals, litter and sanitary waste that may adversely impact water quality; <br /> <br />L. When working in or crossing water bodies, take precautions to contain sediment; <br /> <br />M. Re-stabilize utility construction areas as soon as possible; <br /> <br />N. Protect paved roads from sediment and mud brought in from access routes; <br /> <br />o. Dispose of temporary erosion and sediment control measures; <br /> <br />P. Maintain all temporary and permanent erosion and sediment control practices; and, <br /> <br />Q. Removal of sediment from streets at the end of each day <br /> <br />Subd. 4 Plan Content. The Erosion and Sediment Control Plan content shall include the <br />following unless waived by the PWD: <br /> <br />A. Contact information for the Permittee; <br /> <br />B. Address of site where the land disturbing activity is proposed; <br /> <br />C. Signature(s) of the owner(s) of the site or an authorized representative; <br /> <br />1500 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.