My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Motion to Authorize Staff to Contract with Bolton & Menk
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-8-08-R
>
7C, Motion to Authorize Staff to Contract with Bolton & Menk
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 10:05:24 AM
Creation date
9/10/2008 10:02:57 AM
Metadata
Fields
Template:
General
Document
Motion to Contract Bolton & Menk
General - Type
Motion to Contract Bolton & Menk
Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TRA VIS WINTER, P .E. <br />Project Engineer <br /> <br />2005 Parkway Addition II Improvements, Marshall, Minnesota <br />An 82-lot subdivision, this project was $2.5 million and included 9,000 feet of curb and gutter <br />construction, site grading, sanitary sewer, watermain, storm sewer and bituminous pavement construction. <br /> <br />2005 Raw Watermain Improvements, Redwood Falls, Minnesota <br />This project included replacing t mile of the city's raw water line~ <br /> <br />2004 Riverside Park Lift Station and Forcemain Upgrades, Springfield, Minnesota <br />This was a $250,000 reconstruction project that included sanitary sewer replacement and rehabilitation of a <br />lift station. <br /> <br />2004 Wastewater Aeration Pond Piping Replacement, Redwood Falls, Minnesota <br />This reconstruction project included replacement of the aeration piping for the Redwood Falls <br />community's wastewater treatment ponds. <br /> <br />2004 Watermain Improvements, Lucan, Minnesota <br />This was a $250,000 Rural Development reconstruction project. It included replacement of segments of <br />the communities' water system by trenchless installation. Some additional tasks involved with this project <br />included: filing weekly progress reports, conducting weekly progress meetings with the contractor, Rural <br />Development Association staff and city officials. <br /> <br />2004 Lower Sioux Community Addition Improvements, Lower Sioux Community, Minnesota <br />This reconstruction project included replacement of sanitary sewer, watermain installation and bituminous <br />surface construction. <br /> <br />2005 Fairfax Street & Utility Improvements, Fairfax, Minnesota <br />This $200,000 reconstruction project included sanitary sewer, watermain, storm sewer, curb and gutter and <br />bituminous street reconstruction. <br /> <br />2004 Southeast Development Improvements, Redwood Falls, Minnesota <br />A rehabilitation project, it included extending sanitary sewer and watermain in preparation for a new <br />residential subdivision. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.