My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-08-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2008
>
10-13-08-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2008 11:14:52 AM
Creation date
10/28/2008 11:14:33 AM
Metadata
Fields
Template:
General
Document
10-13-08 WS Minutes
General - Type
Worksession Minutes
Date
10/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS CITY COUNCIL WORK SESSION - OCTOBER 13, 2008 <br /> <br />8 <br /> <br />a 10 foot bituminous trail on one side, eight foot sidewalk on the other, with a 1 0 <br />foot grass boulevard with trees. He indicated County Road H would have three <br />lanes of traffic in each direction with a left nand turn lane. <br /> <br />Councilmember Grant stated he would be in favor of concrete sidewalks on both <br />sides of County Road H because this was the entryway into the development. <br /> <br />Councilmember Holmes stated this may be a concern due to the fact bikes were <br />not allowed on sidewalks or in the streets. <br /> <br />Mayor Harpstead indicated the PTRC wanted this area to accommodate bicycles, <br />rollerblading and strollers. He explained however, that he was in favor of concrete <br />sidewalks along County Road H because it was a major entryway and that <br />residential areas would have bituminous. <br /> <br />Mr. Whitlock noted the Council could further discuss the trails and sidewalks at <br />the October 15th work session. <br /> <br />Mayor Harpstead explained he would like as many power lines buried as possible <br />in this area. <br /> <br />Ms. McJilton noted this comment but stated other factors may make this <br />impossible and that wires would have to go over the creek. She indicated where it <br />can be done, the wires will be buried. <br /> <br />Further discussion was held regarding monument signs, their location and the price <br />range for the development. <br /> <br />Councilmember McClung stated he would be In favor of a brick and stone <br />monument style sign used if the budget allowed. <br /> <br />Mr. Whitlock then reviewed the layout and proposed design for the primary <br />parkway. He stated this roadway ran between commercial and higher density <br />housing. Mr. Whitlock ran through the specs for the number of lanes, boulevard <br />size, etc. <br /> <br />Councilmember McClung stated he was very concerned about the look and feel of <br />this intersection. He noted there would be a great deal of traffic flowing into the <br />development off Highway 96 through this intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.