My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, Concept Plan of Bridge Over TH 10
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
10-27-08-WS
>
1A, Concept Plan of Bridge Over TH 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2008 11:26:00 AM
Creation date
11/3/2008 11:25:50 AM
Metadata
Fields
Template:
General
Document
1A, Concept Plan of Bridge Over TH 10
General - Type
1A, Concept Plan of Bridge Over TH 10
Date
10/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Benefits of Concept Plan for N. Snellina I Old Hwv 10 <br /> <br />1. Better way to connect current City to TCMP Development <br /> <br />2. N. Snelling has been upgraded to current 36' wide curb to curb street <br /> <br />3. Eastside homes (only 6) have large set back buffers from street <br /> <br />4. Church properties have large set back buffering to west side of street <br /> <br />5. City owns land at both sides of new bridge access points <br /> <br />6. A good current grade at Briarknoll / Old Hwy 10 <br /> <br />7<< Old Snelling I Old 10 were identified as a regional trail corridor <br /> <br />8. Can better accommodate bike / foot traffic to high school from all parts of the City <br /> <br />9. Better connection to Long Lake Regional Park, Le. south side of Round Lake over <br /> <br />Railroad Bridge <br /> <br />10. Best overall access to all parts of the city. <br />
The URL can be used to link to this page
Your browser does not support the video tag.