My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4B, Approve Planning Case 08-032
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
11-24-08-R
>
4B, Approve Planning Case 08-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2008 9:47:51 AM
Creation date
11/24/2008 9:44:33 AM
Metadata
Fields
Template:
General
Document
4B, Approve Planning Case 08-032
General - Type
4B, Approve Planning Case 08-032
Date
11/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br /> <br />COMM. NO.: <br />CLIENT: <br />PROJECT: <br /> <br />6131.022.01 <br />Boston Scientific Company <br />Arden Hills Planning Case #04-04 <br /> <br />SUBJECT: <br />MEMO BY: <br />DATE: <br /> <br />Boston Scientific Temporary Walkway <br />Judd Brasch <br />31 October 20087 <br /> <br />ATTENTION: <br />COPY: <br /> <br />James Lehnhoff <br />Lome Rothbauer <br />File (4) <br /> <br />Arden Hills <br />BSC CRM <br /> <br />Boston Scientific is requesting an extension for use of the T emporary Walkway <br />connecting Building 10 and Building 3 to the edge of Innovation Way (formerly <br />Femwood Avenue). <br /> <br />The walkway was approved as a temporary link to provide a safe and comfortable <br />pedestrian connection between Building 10 and Building 3 (formerly E and Training <br />Center, respectively). This connection provides an enclosed, heated path across a portion <br />of the Boston Scientific Campus. It also reduces the need for a larger shuttle bus service <br />between buildings during winter weather. <br /> <br />The structure was intended to be used by Guidant employees until a permanent skyway <br />structure was constructed with the next phase of building. The acquisition by Boston <br />Scientific has delayed the next anticipated construction phase. <br /> <br />We are requesting a five year extension of use of the temporary walkway. The master <br />plan would remain as approved with no new building or parking modifications requested <br />at this time. Boston Scientific would adhere to the conditions listed in the 2/23/04 staff <br />report under planning case 04-04 that was approved On 3/8/04. <br /> <br />JAB: <br />P:Corporate\Boston Scientific \Arden Hills\Building 1 O\tempwalkway\Documentation \04 Code <br />Regulatory\MEMOjab 1 00308.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.