My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Adopt Ordinance 2008-016
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
12-08-08-R
>
7C, Adopt Ordinance 2008-016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2008 12:09:20 PM
Creation date
12/9/2008 12:06:06 PM
Metadata
Fields
Template:
General
Document
7C, Adopt Ordinance 2008-016
General - Type
7C, Adopt Ordinance 2008-016
Date
12/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />With Changes <br /> <br />(Indicated in Parenthesizes) <br /> <br />Zoning Permit - Driveway <br />Construction <br /> <br />$18.00 for first 1,000 square feet <br />+ $6.00 each additional 1,000 <br />or fraction thereof <br />$1 0.00 <br /> <br /> <br />Recreational Vehicle Parking <br />Permit <br />Home I Permit <br />Home Occupation II Permit <br /> <br />7 Day Permit, renewable once <br />12 months <br /> <br />No <br />$350.00 <br /> <br />Consulting fees and <br />administrative escrow <br />Per Excavation <br />Staff costs for conducting the <br /> <br /> <br /> <br />Permit <br />Erosion Control Fees - Less than <br />one acre <br />Erosion Control Fees - One to <br />five acres <br />Erosion Control Fees - Six or <br />more acres <br />Grading Fee - 50 cubic yards or <br />less <br />Grading Fee - 51 to 100 cubic <br /> <br />Staff costs for conducting the <br /> <br />$460.00 ($450.00) <br /> <br />Staff costs for conducting the <br /> <br />$720.00 ($700.00) <br /> <br />Staff costs for reviewing grading <br />and <br />Staff costs for reviewing grading <br />and <br />Staff costs for reviewing grading <br />and <br />Staff costs for reviewing grading <br />and <br />Staff costs for reviewing grading <br />plans and conducting inspections <br /> <br />No charge <br /> <br /> <br />$30.00 <br /> <br />$50.00 <br /> <br />GradingFee-1,001 to 10,000 <br />cubic <br />Grading Fee -10,001 or more <br />cubic yards <br /> <br />$75.00 <br /> <br />$75.00 for first 10,000 cubic <br />yards + $30.00 each additional <br />10,000 cubic yards, or faction <br />thereof + additional plan review <br />fee of$50/hour (min. charge of <br />1/2 <br /> <br />Appeal of Administrative <br />Zoning, Sign, or Subdivision <br />Decisions <br /> <br />Cost of staff time to prepare <br />appeal information <br /> <br />$75.00 <br /> <br /> <br />$37.00 ($35.00) <br /> <br />$10.50 ($10.00) <br /> <br /> <br />Water Connection <br />Water Turn <br />Water Permanent Disconnect <br />Curb Box and Service Lead, 1" <br />Service Connection on <br />Unsurfaced Street <br />Restoration of Typical Road Mix <br />Street <br />Restoration of Higher-Type <br />Street <br /> <br />$205.00 <br />$155.00 ($150.00) <br /> <br />$100.00 ($60.00) <br /> <br />Set by Engineer <br /> <br />Page 5 of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.