My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, 2030 Comp Plan Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
12-15-08-Special
>
1A, 2030 Comp Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2008 2:11:42 PM
Creation date
12/19/2008 2:11:00 PM
Metadata
Fields
Template:
General
Document
1A, 2030 Comp Plan Update
General - Type
1A, 2030 Comp Plan Update
Date
12/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o Page 10-14: Included three new implementation strategies based on comments from the Rice <br />Creek Watershed District and to address water resource requirements from the Met Council. <br />The implementation strategies recognize the need to: <br />· complete Total Maximum Daily Load (TMDL) studies with Rice Creek Watershed <br />District. TMDL relate to water quality studies being conducted throughout the metro' <br />area; <br />· identify and adopt best management practices to protect the water quality of lakes, <br />streams, wetlands, and groundwater; and, <br />· reduce nonpoint pollution sources, including educating residents and using best <br />management practices. <br /> <br /> <br />Chapter 13: Public Facilities, Services, and Infrastructure <br />o Completed the Water Resource Management sections as required by the Metropolitan <br />Council. These sections are almost entirely new since the last review. This includes: <br />· Page 13-2 and Appendix D - Water Supply Plan <br />· Page 13-3 and Appendix E - Sanitary Sewer <br />· Page 13-3 and Appendix F - Storm/surface Water Management; <br />· Page 13-7 and Appendix G - Inflow and Infiltration <br /> <br />Submission to the Metropolitan Council <br /> <br />Once the City Council grants preliminary approval of the Comprehensive Plan, the plan will be <br />submitted to the Metropolitan Council for official review. The Metropolitan Council will then <br />review the plan for conformance with the System Statement, the Metropolitan Land Planning Act, <br />and other regional policy plans (i.e. transportation, water resources, and parks and open space). If <br />the Metropolitan Council determines that the plan is in conformance with regional policies and <br />regulations, it will be returned to the City for official adoption by the City Council. If the plan is <br />deemed incomplete or not in conformance with Met Council requirements, it will be returned to the <br />City with an explanation of what needs to be addressed or clarified. <br /> <br />It is not unusual for the Metropolitan Council to find that a change or further clarification is needed <br />somewhere in a comprehensive plan. The requirements for the comprehensive plan are <br />considerable, though the City has striven to meet those requirements. Staff will keep the City <br />Council up to date onany issues that may arise and if additional work is needed. <br /> <br />The Metropolitan Council is typically required to notify a city within 15 working days of receiving <br />the plan if it is complete or incomplete. The Metropolitan Council then strives to review the <br />Comprehensive Plan with 120 days. <br /> <br />City of Arden Hills <br />Special City Council Meetingfor December 15,2008 <br /> <br />\\Ahdocs1\ah\AHdata\Planning\Comprehensive Plan \Memos \121508 - CC Report - 2030 Comp Plan Update.doc <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.