My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-04-09-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2009
>
03-04-09-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 3:37:52 PM
Creation date
2/27/2009 9:12:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Extending the B2 District design regulations to the B3 District. <br />8. Amending the review process for the B-4 and I -Flex Districts. <br />9. Adopting an additional definition and revising the review process for drive -up <br />windows, drive-in business, and fast food restaurants. <br />10. Amending the ordinance regarding acceptable storage areas for garbage, <br />refuse, and recycling containers. <br />Interim Use Permit <br />With the addition of an interim use permit process to the Zoning Code in 2008 permitting <br />"Institutional Housing" within the B-2 zoning district, the City approved one Interim Use <br />Permit to convert the former Holiday Inn into a temporary (three years) residence hall for <br />Northwestern College. <br />PUD Amendments <br />In 2008, the City approved one PUD amendment, allowing for the construction of a <br />nitrogen tank on the Boston Scientific campus. <br />Site Plan Reviews <br />There were a total of five site plan reviews during 2008, the City approving four of them. <br />Two of the approved site plan reviews pertained to the addition of detached garages on <br />existing residential lots. The other two were institutional, one being Northwestern <br />College's request to construct a new parking lot and roadway on their campus while the <br />other addressed construction of a nitrogen tank on the Boston Scientific campus. <br />One additional site plan review was withdrawn before reaching the Planning Commission <br />and also involved construction of a detached garage on a residential property. The <br />original application was deemed incomplete with the applicant never responding to Staff <br />requests for more information. <br />Variances <br />Of the five variances brought before the City in 2008, three were approved, one was <br />denied and one withdrawn. All five variances were residential in nature. The first <br />approved variance was to relocate and rebuild a detached garage and silo (also approved <br />through a site plan review). The second approved variance was for asingle-family home <br />addition that encroached eight feet into the front yard setback. The final approved <br />variance was granted for the construction of a garage addition that would encroach l 1 <br />feet into the combined side yard setback and two feet into the front yard setback. <br />City ofArden Dills <br />Planning Commission Meeting for March 4, 2009 <br />P: IPlanninglDepartment Records4CWarterly chi Year End Reports 120081030409 - 2008 Year in Revieâ–ºwforPC.doc <br />Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.