My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, Safe Routes to School Project Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
03-16-09-WS
>
1A, Safe Routes to School Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 12:05:57 PM
Creation date
4/3/2009 2:28:34 PM
Metadata
Fields
Template:
General
Document
1A, Safe Routes to School Project Update
General - Type
1A, Safe Routes to School Project Update
Date
3/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Safe Routes to School Project Review - 03/16/09 <br /> <br />BUDGET <br />When the grant was written in 2007, the preliminary cost .estimate for this project was <br />$263,145.60. After completing a refined environmental investigation and revising the plans to <br />meet the Rice Creek Watershed District's (RCWD) wetland protection requirements, the <br />engineer's estimate is $442,665.37. Below is the breakdown of project costs. <br /> <br />PROJECT COSTS <br /> <br /> GRANT ENGINEER'S +/- <br /> ESTIMATE ESTIMATE <br />Pathway $164,700 $179,171 ($14 4-'1 00) <br />: ." , I" . ~ . .."" <br />Retaining walls $66,375 ($66,375~OO) <br />Drainage $9,300 $94,855 ($85~555~OO) <br />Crosswalks $1,800 $1,800 - <br />Signals $15,000 $15,000 - <br />Hydrants $36,000 $36,000 - <br />Engineering $35,345.60 $48,464.37 ($1 ,118.77) <br />Evaluation $1,000 $1,000 - <br />Total $263,145.60 $442,665.37 ($1 1,5 9fS 77) <br /> <br />As shown, the engineer's estimate is higher than the preliminary estimate. This is mainly the <br />result of items added to comply with the RCWD's wetland protection requirements and <br />necessary drainage improvements. The preliminary plans for this project are attached <br />(attachment Ib). A summary and explanation of the changes to the project estimate is as <br />follows: <br /> <br />1. Pathway: The original estimate used 2007 construction unit prices. The increase to <br />this portion of the project is the result of increases to construction costs in the last 2 <br />years. Estimated cost: $14,471.00 <br />2. Retaining Walls: In order to avoid impacts to the wetland, and keep the pathway on <br />public land, it will be necessary to construct a retaining wall along the pathway east <br />of the lift station road. This wall will be between 4 and 5 feet tall. Also, for safety, <br />we will need to install a fence along this portion of the pathway. Estimated cost: <br />$66,375.00. <br />3. Drainage: There are three main items that were identified as drainage needs for this <br />proj ect. These were; the creek crossing in the Ramsey County Open Space, drainage <br />improvements, and erosion control. <br /> <br />. Creek Crossing: $75,,000 <br />A portion of this project connects County Road E-2 to Venus Avenue through <br />the Ramsey County Open Space. This open space contains DNR protected <br />wetlands as well as a creek. Any modifications to the crossings or wetlands in <br />this area require a permit from Rice Creek Watershed District. After reviewing <br />the project with them, they are requiring that the new creek crossing be sized so <br />it does not impe~e the flood plain of this natural drainage way. There are two <br />ways that this could be accomplished; by constructing a bridge or by building a <br />culvert. Since the cost to construct a bridge would be between $150-250,000, <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.