Laserfiche WebLink
<br />RECOMMENDED COUNCIL ACTION <br />A. Provide direction regarding which option should be analyzed further. <br /> <br />B. If option number three is chosen: a motion to approve addendum number two to the <br />original Bolton and Menk contract, which includes an additional $30,000 in <br />engineering fees in order to design pedestrian improvements to the CP Rail bridge on <br />the east side. <br /> <br />- 4- <br />