My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, CP Rail Bridge Improvement Options
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
05-11-09-R
>
7B, CP Rail Bridge Improvement Options
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 11:33:40 AM
Creation date
5/12/2009 11:26:32 AM
Metadata
Fields
Template:
General
Document
CP Rail Bridge Improvement Options
General - Type
CP Rail Bridge Improvement Options
Date
5/11/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ADDENDUM NO.2 <br /> <br />AGREEMENT FOR PROFESSIONAL SERVICES <br /> <br />FEASffiILITY REPORT FOR TRAILICP RAIL BRIDGE IMPROVEMENTS <br /> <br />CITY OF ARDEN HILLS, MINNESOTA <br /> <br />This Addendum shall become a part of the original Agreement for Professional Services, dated September 15, <br />2008. This addendum is in regards to the design of a second trail underpass across the CP Rail. <br /> <br />I. Scope of Work <br /> <br />For the purposes of this Addendum, Basic Services to be provided by the CONSULTANT for the <br />reconstruction of Babcock Trail include: <br /> <br />Consistent with the Scope of Work detailed in Addendum #1, Bolton & Menk will complete a topographic <br />survey, design, and engineering required to prepare final plans and specifications for a second trail <br />underpass along the east side of Old Highway 10, under the existing CP Rail bridge. Those meetings and <br />common design details that are detailed in Addendum #1 for the underpass on the west side of Old <br />Highway 10 will be completed in concert with the east side design in order to minimize project <br />redundancies. The final set of construction documents for the east and west side designs will be packaged <br />and bid together. <br /> <br />II. Compensation for Services <br /> <br />Fees for the scope of work as described above will be a lump sum amount of $30,000, and will be added <br />with the contract amount for Addendum #1. <br /> <br />III. Signatures <br /> <br />This instrument is subject to the terms of the original agreement referenced above. This Agreement may <br />only be amended, supplemented, modified or canceled by a duly executed written instrument signed by <br />both parties. <br /> <br />In witness whereof, the parties hereto have caused this Agreement to be executed in their behalf: <br /> <br />CLIENT: City of Arden Hills <br /> <br />CONSULTANT: Bolton & Menk~ Inc. <br /> <br />Mark D. Kasma, BMI Office Manager <br /> <br />Marcus A. Thomas, Associate Engineer <br /> <br />Date <br /> <br />Date <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.