Laserfiche WebLink
<br />May 6, 2009 <br />Page 2 <br /> <br />The July, 2008 agreement requires that Presbyterian homes purchase the replacement <br />pumps. The Arden Hills Code Section J.01.0.08, subd. 4 requires that the in-line grinder <br />be purchased by Presbyterian Homes. <br /> <br />On April 27, 2009, the Arden Hills City Council directed the City staff to purchase tWO:l.O <br />horsepower submersible pumpsj and to notify Presbyterian Homes that it needs to pay <br />the cost of the pumps, as well as install and maintain an in line grinder in the private <br />section of the sanitary sewer pipe that leads from the Presbyterian Homes facility to <br />the City's sanitary sewer main. As an alternative related to the in-line grinder, since <br />Presbyterian Homes is planning a construction project in the near future, the in-line <br />grinder could be installed in the City's lift station on a temporary basis, and relocated to <br />the private section of the sanitary sewer line at the time of the planned Presbyterian <br />Homes construction project. Under either of these optionsl Presbyterian Homes would <br />be responsible for the cost of purchasing and installing the in-line grinder, the cost of all <br />maintenance of the in-line grinder, and the cost of relocating the in-line grinder at the <br />time of the construction project. <br /> <br />The installation of the in-line grinder needs to be done in coordination with the City's <br />purchase and installation of the two 10 horsepower submersible pumps. The City <br />anticipates that the installation of the two pumps will be completed by May 29, 2009. <br /> <br /> <br />Cc: Mark Meyer, (FO, Presbyterian homes <br />