My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1C, 5-Year PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
06-15-09-WS
>
1C, 5-Year PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2024 11:10:33 AM
Creation date
6/12/2009 11:11:08 AM
Metadata
Fields
Template:
General
Document
5-Year PMP
General - Type
5-Year PMP
Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Capital Improvement Plan <br /> <br />City of Arden Hills, Minnesota <br /> <br />Operational Impact/Other <br /> <br />The street has deteriorated past the point where other forms of maintenance are cost-effective. Long-term, reconstruction will provide a consistent <br />roadway section that will reduce costs associated with patching potholes and other pavement failures. M onitoring/maintenance win be required for <br />new stormwater features that are not resident-maintained rain gardens. <br /> <br />2010 thru 2014 <br /> <br />Contact Engineer <br /> <br />Department Street Departlnent <br /> <br /> <br />avement deterioration. <br /> <br />Produced Using the Plan-It Capita! Planning Software <br /> <br />Thursday. June /1.. 2()()9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.