Laserfiche WebLink
<br />Proposed Contract Amendment Chan!!es <br /> <br />The proposed contract amendment would completely replace sections 6 and 25 of the existing <br />contract (Attachment A). Section 6 addresses the payment terms and processing fees. The <br />contract amendment includes additional materials in the revenue share formula and a structure <br />processing fee. Section 25 addresses what occurs if market demand ceases for a particular <br />material or if the processing fees become burdensome to the City. To help facilitate the review, <br />the primary changes are outlined as follows: <br /> <br />Section <br /> <br />6.1 Monthly Price per Residential Dwelling Unit <br />· The existing contract includes provisions for an annual .increase to the price per <br />residential dwelling unit based on the CPI for the Upper Midwest as determined by <br />the Federal Reserve Bank of Minneapolis. The revised contract caps the annual <br />increase to three percent or the CPI, whichever is less. The monthly price per <br />residential dwelling unit increased from $2.95 in 2008 to $3.06 in 2009, which was a <br />3.7 percent change. <br /> <br />6.2.1 Material Sales Revenue Share and Processing Fees <br />· The existing contract includes revenue share for only aluminum and paper. The <br />contract amendment would extend that to include glass, steel, and three types of <br />plastic. Paper has also been disaggregated into its four components. The additional <br />materials were added so that the actual costs and revenue of each material could be <br />tracked more accurately. Under the existing contract, the City does not receive <br />revenue from these additional materials but does pay higher processing fees for <br />aluminum and paper to cover the processing costs of these other materials. <br />· The price per ton for aluminum in the existing contract is based on the American <br />Metal Market (AMM). Eureka is requesting that this be changed to the actual price <br />paid to Eureka in the local market. The AMM is based on Chicago prices, though <br />Eureka is paid based on the local market. Based on a review of the local market <br />prices since March 2008, the local market price is slightly less but there is not a <br />significant difference. <br /> <br />6.2.2 Processing fees <br />· The processing fee for all paper types has been reduced from $75/ton to $60/ton. <br />· The processing fee for aluminum has been reduced from $150/ton to $90/ton. <br />· The processing fee for glass, steel, and plastic have been set at $90/ton. <br />· Residual materials, which are non-recyclable materials, are not subject to any costs or <br />processing fees. The contract amendment specifically states a $0 cost to discourage <br />Eureka from picking up unrecyclable materials and to focus on education. <br /> <br />Metro-in et\ ardenh ills \Admin \ Council/Agendas & Packet Information /2009\06-29-09 - Regular Meeting - Eureka <br />Recycling Contract Amendment <br /> <br />Page 2 of5 <br />