My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, Motion to enter into an agreement with Bolton and Menk for erosion correction of Old City Hall
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
07-13-09-R
>
7B, Motion to enter into an agreement with Bolton and Menk for erosion correction of Old City Hall
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 4:25:13 PM
Creation date
7/13/2009 4:20:57 PM
Metadata
Fields
Template:
General
Document
erosion correction - Old City Hall Trail
General - Type
erosion correction - Old City Hall Trail
Date
7/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />M <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />July 13, 2009 <br /> <br />TO: <br /> <br />Mayor and City Council <br />Ron Moorse, City Administrator <br /> <br />FROM: <br /> <br />Greg Hoag, Public Works Director <br /> <br />SUBJECT: <br /> <br />Engineering Services Agreement for Erosion Correction on Old City <br />Hall Trail <br /> <br />BACKGROUND <br /> <br />The City of Arden Hills approved an engineering consultant pool on August 27, 2007 for use on <br />specialized projects or projects that the City of Roseville's Engineering Department may not <br />have the capacity to assist with. <br /> <br />Included in the approved 2009 Capital Improvement Program is $20,000 to complete a project to <br />correct a drainage issue along the Old City Hall trail adjacent to the back yard of the residential <br />property at 4504 Keithson Drive. Surface water is currently flowing from the pathway through <br />the property at 4504 Keithson Drive and causing erosion of a hillside and garden on the <br />resident's property. <br /> <br />To assist in determining a solution for this issue, staff asked Bolton and Menk, Inc. to review the <br />site and provide a scope of the services to prepare plans and specifications for a project. Bolton <br />and Menk, Inc. submitted a proposal for a total lump sum of $4,900; a copy of the proposal is <br />attached. After bids for this project are received, staffwill bring the project itselfback to the <br />City Council for final approval. It is also anticipated that we will also be asking Council to <br />consider an addendum to this proposal to then include construction observation services. <br /> <br />FINANCIAL IMPLICATIONS <br /> <br />The costs for this project will be paid for using Surface Water Management Funds. <br /> <br />P:\Admin\Counci1\Agendas & Packet Information\2009\07-13-09 Regular\Packet Information\7 13 09 CC Memo Old City Hall Erosion <br />Project.docgineering Svcs <br />
The URL can be used to link to this page
Your browser does not support the video tag.