Laserfiche WebLink
<br />City of Arden Hills <br /> <br />Chapter 15 Erosion and Sediment Control Ordinance <br /> <br />D. Project description including the nature and purpose of the land disturbing activity <br />and the amount of grading involved; <br /> <br />E. Phasing of construction and timeline; <br /> <br />F. Existing and proposed site conditions, including topography, vegetation, and <br />drainage; <br /> <br />G. Adjacent areas, neighboring streams, lakes, wetlands, residential areas, roads, etc., <br />which might be affected by the land disturbing activity; <br /> <br />H. Soil data including soil names, mapping units, erodibility; <br /> <br />I. Critical erosion areas, which are areas on the site that have potential for serious <br />erosion problems; <br /> <br />J. Erosion and sediment control measures to be used on the site, both during and after <br />the construction process; <br /> <br />K. Temporary and Permanent stabilization to show how the site will be stabilized during <br />and after construction (is completed), including specifications; <br /> <br />L. Storm water management to show how storm runoff will be managed, including <br />methods to be used if the development will result in increased peak rates or volume <br />of runoff; <br /> <br />M. Maintenance and schedule of regular inspections and repair of erosion and sediment <br />control structures; and, <br /> <br />N. Any calculations that were made for the design of such items as sediment basins, <br />diversions, waterways, and other applicable practices. <br /> <br />1520.02 Review of Permit Application <br /> <br />Subd. 1 General. The PWD shall review the Erosion and Sediment Control Plan to ensure <br />compliance with the erosion and sediment control practice specifications and erosion and <br />sediment control practices. <br /> <br />Subd. 2 Permit Approval. If the PWD determines that the Erosion and Sediment Control <br />Plan meets the requirements of this ordinance, the PWD shall issue a permit, valid for a <br />specified period of time that authorizes the land disturbance activity contingent on the <br />implementation and completion of the Erosion and Sediment Control Plan. <br /> <br />Subd. 3 Permit Denial. If the PWD determines that the Erosion and Sediment Control <br />Plan does not meet the requirements of this article, the PWD shall not issue a permit for the <br />land disturbance activity. The Erosion and Sediment Control Plan must be resubmitted for <br /> <br />1500 - 7 <br />