My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-09-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2009
>
06-15-09-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2009 4:47:10 PM
Creation date
8/13/2009 4:46:27 PM
Metadata
Fields
Template:
General
Document
Worksession Minutes
General - Type
Worksession Minutes
Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS CITY COUNCIL WORK SESSION - JUNE 15, 2009 <br /> <br />6 <br /> <br />Mayor Harpstead suggested that the new data privacy policy be considered with <br />this communication tool. He asked that this item be used by the Council for the <br />next several months and brought back for further discussion to see how it was <br />working. <br /> <br />C. Public Works PMP & Equipment Replacement Plan <br /> <br />Civil Engineer Giga reviewed concerns previously brought to staff about the <br />condition of some of the seal coated streets. Staff reviewed these streets in the field <br />and determined that the seal coat was performing well, but the pavement beneath <br />the seal coat was dry & causing the peeling of the pavement. She indicated the 5 <br />year PMP was adjusted to include these streets within mill and overly projects. <br /> <br />Mayor Harpstead questioned if the Valentine Avenue neighborhood moved up in <br />the maintenance sequence. <br /> <br />Civil Engineer Giga reviewed the proposed 5-year street improvement schedule <br />with the Council. <br /> <br />Councilmember Holden expressed concerns with the condition of West Floral <br />Drive. <br /> <br />Public Works Director Hoag stated the neighborhood does need to be <br />reconstructed but that it was not as bad as some of the other neighborhoods. <br /> <br />Councilmember Holden questioned why there were so many watermain breaks in <br />one area of the City near Venus and Fairview. She asked if they were fixed in 2004 <br />if they should need repair again in the near future. <br /> <br />Civil Engineer Giga stated multiple breaks in one area indicated the poor <br />condition of the soil and pipe overall. <br /> <br />Councilmember Holmes questioned if the recurrent PMP plan took into account <br />watermain breaks. <br /> <br />Public Works Director Hoag indicated the soil conditions impacted the <br />conditions of the streets and water main pipes greatly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.