My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1C, Update on Erosion Correction Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
09-21-09-WS
>
1C, Update on Erosion Correction Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:06:40 AM
Creation date
9/18/2009 3:29:02 PM
Metadata
Fields
Template:
General
Document
Erosion Correction Project
General - Type
Erosion Correction Project
Date
9/21/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Greg Hoag,City of Arden Hills <br /> Page 2 <br /> reconstruction would be$15,000-$20,000. <br /> Option 3 would eliminate the existing slope within the subject property and replace it with stepped or <br /> tiered retaining walls and associated fill,all on private property. The objective of the walls would be to <br /> create finished grades that drain toward the trail,allowing the water to flow past the property as opposed <br /> to flowing into it. The total height of the walls would be approximately five to six feet high. There <br /> would be no significant improvements made to the trail under this option. We estimate the cost to <br /> construct the walls and associated fill would be approximately$25,000-$30,000. <br /> While both options 2 and 3 can be effective at correcting the drainage problems at 4504 Keithson, we <br /> would recommend that the City consider implementing option 2,as it is more cost effective and provides <br /> for the necessary rehabilitation of the trail in this area. <br /> If you have any questions regarding the three options we considered and their associated costs,please do <br /> not hesitate to contact me. We are prepared to assist the City in completing the design for whichever <br /> alternative you find most appropriate. Thank you for allowing Bolton&Menk,Inc.to assist you and the <br /> City of Arden Hills with this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.