Laserfiche WebLink
PARK EVALUATION RESULTS <br /> HAZELNUT PARK <br /> Recent Improvements <br /> Building moved from Cummings Park in 2008 <br /> Tennis and Basketball Courts resurfaced in 2008 <br /> PTRC buckthorn removal projects in 2008 and 2009 <br /> Soccer field given 2008 fall and 2009 summer off to rest <br /> Caps for ball field fence tops installed summer 2009 <br /> Park signs repainted in summer of 2009 <br /> Future Improvements Scheduled for Park <br /> Playground mulch is scheduled to be added in spring of 2010 <br /> Rankings <br /> 1. Variety of Park Amenities 4.5 avg 6 responses <br /> 2. Condition of Amenities 4.3 avg 6 responses <br /> 3. Park Upkeep 4.2 avg 6 responses - <br /> 4. Trails 3.8 avg 6 responses <br /> 5. Adequate Resting 3.8 avg 6 responses <br /> Benches/Resting Spots <br /> 6. Park Signage 4.2 avg 6 responses <br /> 7. Natural Beauty 4.2 avg 5 responses <br /> 8_ Overall Appearance 4.5 avg 6 responses <br /> OVERALL AVERAGE 4.2 avg <br /> Final Comments—Sugqestions for Improvements <br /> • metal benches <br /> perhaps a map or list of amenities since it is not very apparent in driveway <br /> basketball and tennis courts are beautiful and the hockey rink is in good <br /> shape <br /> • buckthorn was removed but is coming back <br /> • t know it's a drought year, but the grass in all the parks looks rough —do we <br /> aerate/fertilize our grassy areas yearly or every other year? <br /> • church owns fields <br /> • parking lot rented from church <br /> 0 paved trans ok <br />