Laserfiche WebLink
PARK EVALUATION RESULTS <br /> INGERSON PARK <br /> Recent Improvements <br /> Park sign was painted this summer, 2009 <br /> Future Improvements Scheduled for Park <br /> Basketball court is tentatively scheduled for a resurface in fall, 2009 <br /> Playground mulch is scheduled to be added in spring, 2010 <br /> Rankincts <br /> 1. Variety of Park Amenities 3.0 avg 6 responses <br /> 2. Condition of Amenities 3.0 avg 6 responses <br /> 3. Park Upkeep 3.8 avg 5 responses <br /> 4. Trails N/A 0 responses <br /> 5. Adequate Resting 3.6 avg 5 responses - <br /> Benches/Resting Spots <br /> 6. Park Sigraage 4.0 avg 7 responses <br /> 7. Natural Beauty 4.5 avg 6 responses <br /> 8. Overall Appearance 4.1 avg 7 responses <br /> OVERALL AVERAGE 3.7 <br /> Final Comments—Sugqestions for Improvements <br /> • amenities are half court, 2 swings, shelter with 2 tables <br /> • I like the swing benches <br /> • nice playground area—equipment in good shape and wood chips <br /> • bases of trees could be (rimmed of the branches growing out of trunk bases <br /> • great play structure <br /> • play structure is good and picnic shelter is good <br /> • need another bench or two by play structure <br /> • no Aorta potty <br /> • no Aorta potty <br /> • no Aorta potty <br /> • no bathrooms—do we need to spend the money? <br /> • needs toilet <br /> • all okay except for basketball court <br /> • great except for basketball court <br />