Laserfiche WebLink
a <br /> PARK EVALUATION RESULTS <br /> VALENTINE PARK <br /> Recent improvements <br /> Park sign was painted this summer, 2009 <br /> Playground mulch was added in summer of 2008 <br /> Future Improvements Scheduled for Park <br /> Future improvements will depend art the analysis of the elevations of Lake <br /> p Y <br /> Valentine—which staff is currently working on. <br /> Rank <br /> I- Variety of Park Amenities 2.8 av 4 <br /> g responses p nses <br /> 2. Condition of Amenities 2.2 av 5 <br /> g responses p nses <br /> 3. Park Upkeep 2.6 av 5 <br /> g responses p ses <br /> 4. Trails N/A 0 responses <br /> p ses <br /> 5. Adequate Resting 2.6 avg 5 responses <br /> Benches/Resting Spots <br /> 6. Park Signage 4.0 av 5 <br /> g responses p nses <br /> 7. Natural Beauty 2.4 av 5 <br /> g responses <br /> 8. Overall Appearance 2.0 av 5 <br /> g responses <br /> OVERALL AVERAGE 2.7 av <br /> Final Comments—Suqqestions for Improvements <br /> • The parking lot is in poor shape. <br /> It needs a new parking lot. <br /> • The parking lot is pretty poor. <br /> • It has 1 table, 1 playground bench and 2 ball field benches. <br /> The biggest issue is drainage into Lake Valentine. <br /> It has junky benches. <br /> New park-- it would be great to have some benches at east g end of park <br /> looking at lake. <br /> • It has great potential with the lake view. <br /> • Obviously, we all know, it needs to be redone. Now that I understand the fill <br /> and elevation change that the engineer proposes, I like his pla <br /> n for the park. <br /> This park is a huge eyesore — it will be good to give it a major <br /> 0 g � overhaul. <br /> Needs new mulch under swings in the meantime. <br />