My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4G, Addendum to the Engineering Services Agreement with Bolton & Menk
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
10-12-09-R
>
4G, Addendum to the Engineering Services Agreement with Bolton & Menk
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:48:30 AM
Creation date
10/13/2009 8:56:30 AM
Metadata
Fields
Template:
General
Document
Engineering Services Agreement
General - Type
Bolton & Menk
Date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.� EN HILLS <br />MEMORANDUM <br />DATE: October 12, 2009 <br />TO: Honorable Mayor and City Council Members <br />Ron Moorse, City Administrator <br />FROM: Greg Hoag, Public Works Director <br />SUBJECT: Addendum to the engineering services agreement for the Old City Hall <br />trail erosion correction project. <br />Back�round <br />At the July 13, 2009 City Council meeting an engineering services agreement was <br />approved with Bolton and Menk Inc. for work related to a trail erosion issue. To date <br />survey work and preliminary cost estimates have been completed for three different <br />solutions to the erosion issue. <br />At the September 20, 2009 City Council work session staff, Bolton and Menk Inc., and <br />resident Mr. Ron Nelson discussed the three possible solutions with the Council. The <br />consensus of the Council was to continue forward with the option of building a retaining <br />wall to correct the erosion issue. <br />Under the original scope of services agreement, Bolton and Menk Inc. viewed this as a <br />trail re-design proj ect. With the Council's direction to move forward with the retaining <br />wall option, Bolton and Menk is requesting an addendum to the original scope of services <br />in the amount of $3,800. Their request is primarily based on adding the design of the <br />retaining wall and additional meetings to the original scope of services. See attached <br />memorandum from Marcus Thomas of Bolton and Menk Inc. for a more detailed <br />explanation. <br />Recommendation <br />It is recommended that Council approve the addendum with Bolton and Menk Inc. for the <br />amount of $3,800 which will bring the costs for Engineering Services for this project to <br />$8,700. <br />Council Action Requested <br />. <br />Motion to approve an addendum with Bolton and Menk Inc. in the amount of $3,800 for <br />Engineering Services related to the Old City Hall trail erosion proj ect. <br />
The URL can be used to link to this page
Your browser does not support the video tag.