My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4H, Award 2010 PMP Project to WSB
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
10-12-09-R
>
4H, Award 2010 PMP Project to WSB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:48:43 AM
Creation date
10/13/2009 8:56:42 AM
Metadata
Fields
Template:
General
Document
Award 2010 PMP Project to WSB
General - Type
Award 2010 PMP Project to WSB
Date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s ;� <br />♦ <br />� <br />���� <br />��� <br />� ��ar�. �,� <br />Proposal to Provide �ngineering Services for the <br />2010 Pave�ent Management Progra� <br />Arden Hills <br />2010 f'avement Management Progr-am <br />September 2�, 20�9 <br />Page 1 of b <br />s � <br />�`����� �� ���������� <br />The City is seeking consulting servic�s fo� their 2010 Pavement Nianagement Prograrr�, located near Valentine <br />i�ake and adjacent to Cleve�and Avenue. The project will generally include the reconstruction or mill and <br />overlay of roadways and storrn water n�anagernent. The project is to be designed in the winter of 2009/2010 <br />and constructed in 2010. <br />The requested services include the �ollowing: <br />• Data collection and topographic survey <br />• �easibility report <br />• Prelin�inary/�inal assessment roll <br />• Preliminary/final design <br />• Storm water management plan <br />• Easerr�ents <br />• Permitting <br />• Construction documents <br />• Contract administration <br />• Construction services <br />• As-built survey <br />�1"€:���C� �C��� <br />The project includes t�.e reconstruction of Valentine Avenue, �1ale�tine Court, and �alen�ine Crest Road. It <br />also includes a mi�l and overlay project for Janet Court, Katie Lane, and Katie Court. The City will provide the <br />topographic data and AutoCAD file for Katie Lane and Katie Court. We have re�rievved the site and discussed <br />the project with �ity staff, and have identified the ft�lloWing key aspects: <br />Storm Water Mana,gement — The design of the �torm water system for this project wil� meet Mn/DOT <br />standards, including State Aid Design requirements for Valentine Avenue ar�d City standards for the <br />ren�aining roadways. The design will also meet Rice Greek Watershed District (RCVITD� rules for permitting. <br />WSB specializes in implementing storn� water management practices into neighborhood reconstruction <br />}�rojects, vvhile minimizing/eliminating impacts to adjacent private property. In addition, WSB has project <br />sp�ci�ic experience working in the Valentine Lake waters�ed, �aving completed the drainage analysis for <br />�alentine Park. <br />R�adways — The �avement condition indices for tl�e roadways i�dicate tizat the appropriate pavement <br />�nanagement rnethod has beer� considered. It anticipated that the design will need to i�clude v�ridening <br />�alentine Ave�ue to meet state aid standards. WSB's goal will be to design �l�e roadwa�s and drainage <br />within the existing right of way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.