Laserfiche WebLink
r <br /> EnvironmentalCleanup <br /> o Land remediation <br /> Site requires soil cleanup to industrial standard for FOSET areas <br /> Demolition of buildings,concrete pads,utilities <br /> MPCA Tier 11 Recreational Standard <br /> e Site wide cleanup to recreational standard <br /> MPCA Tier 111 Site Specific Use Standard <br /> * Different levels of cleanup depending on the site use <br /> o Requires additional characterization <br /> * More flexibility requires up front work but potential for savings <br /> Cleanup beyond industrial level could occur in stages as funding is available <br /> 0 Groundwater rernediation <br /> Army remains responsible for groundwater remediation infrastructure <br /> ?3 <br /> MPCA contamination <br /> zone map <br /> .:,;..q. :$::iit d d:S k.iYit.` �.i,:�.q•v:. <br /> ----------------- <br /> :r. <br /> ,A <br /> 'f;R.;yaYJEa:A:. <br /> Source:MPCA,http://Proteus.pca.state.mn.us✓deanup/sites✓tcaap.html 14 <br /> 7 <br />