My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-09-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2009
>
08-10-09-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:13:49 AM
Creation date
11/10/2009 8:51:22 AM
Metadata
Fields
Template:
General
Document
Minutes
General - Type
Minutes
Date
8/10/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AR- DEN HILLS CITY COUNCIL—August 10, 2009 4 <br /> A. Motion to Award the 2009 Sanitary Sewer Lining Project to Visu- <br /> Sewer, Inc., of Pewaukee, Wisconsin, in the Amount of$44,960.50 <br /> Civil Engineer Kristine Giga stated the majority of the City's 42 miles of sanitary <br /> sewer mains were constructed in the late 1950's and early 1960's, utilizing clay the <br /> pipe. Over time the joint materials have failed allowing root intrusion. The 2009 <br /> Capital Improvement Plan includes funding for a sanitary sewer lining program to <br /> extend the life of the City's sanitary sewer by 50 years or more. This technology <br /> essentially installs a new resin pipe inside the old clay the sewer main without <br /> digging up City streets, which results in minimal disruption to residents during <br /> construction. This technology also prevents infiltration of groundwater into the <br /> system and can be credited toward the City's inflow/infiltration surcharge. The <br /> location for the sewer lining project was reviewed and a map was provided to the <br /> Council. There is approximately 1,100 lineal feet of sewer main lining in the areas <br /> identified as having root intrusion or infiltration problems. This project would be <br /> funded using funds from the Sanitary Sewer Enterprise Fund. <br /> Councilmember Holden stated that the budgeted amount for this project was <br /> $75,000. She asked if there had been an engineering estimate or where the cost <br /> estimates had come from for the budget amount. <br /> Civil Engineer Giga stated that the engineering estimate was based on costs <br /> received last year. The prices from last year were higher than the current prices. <br /> Councilmember Holden asked if there were additional sewers that could be lined - <br /> since the costs were favorable. <br /> Civil Engineer Giga stated that Staff is looking into this. The contract with Visu- <br /> Sewer can only be increased by 25% of the contract amount or 250 feet and Staff is <br /> trying to locate an area that fits this criteria. Staff is also talking to Visu-Sewer to <br /> see if they would be amenable to adding to the project. <br /> Councilmember Holden stated that Staff could put another area out for bid if there <br /> are additional areas that need to be done. <br /> Civil Engineer Giga stated that Staff could look at doing this as well. <br /> Mayor Harpstead clarified that the recommendation from Council would be to put <br /> together another project for bid or work with Visu-Sewer to increase the amount of <br /> the contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.