My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-09-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2009
>
09-14-09-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:17:15 AM
Creation date
11/10/2009 8:52:11 AM
Metadata
Fields
Template:
General
Document
Minutes
General - Type
Minutes
Date
9/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—September 14, 2009 5 <br /> 5. PULLED CONSENT ITEMS <br /> 4D. Motion to Adopt Resolution No. 2009-022: Resolution Requesting <br /> Funding from Mn/DOT through the Municipal Agreement <br /> Program for Bridge Improvements to the County Road E Bridge <br /> over Trunk Highway 51 <br /> Civil Engineer Kristine Giga stated that at the August 31, 2009 Regular City <br /> Council Meeting, Staff received direction from Council to prepare an application <br /> for funding through Mn/DOT's 2009 Municipal Agreement Program for <br /> modifications to the existing County Road E bridge over Snelling Avenue (TH5 1). <br /> The City Council amended the original Kimley-Horn County Road E contract to <br /> assist in the preparation of this application. The Municipal Agreement Program <br /> provides funding to construction projects that are developed and administered by <br /> local agencies and provide a benefit to both the local community and the trunk <br /> highway system. Right of way, utility relocation and design costs are not eligible <br /> for funding. The maximum award available for any project is $550,000 for <br /> construction plus 8% for construction engineering and inspection, for a total of <br /> $594,000. Kimley-Horn has provided a preliminary estimate for construction of the <br /> repairs to the County Road E Bridge in the amount of $400,000. The estimate <br /> contains modifications to the existing bridge, as well as bituminous patching, <br /> concrete curb and gutter replacement, striping on the approaches in order to <br /> accomplish the centerline shift and sidewalk/path approaches. It is not likely that <br /> there will be utility relocation or right of way costs involved with the project. <br /> Councilmember Holmes stated that the fifth "Whereas" in the resolution <br /> references local share of the costs. She asked what the match was. <br /> Civil Engineer Giga stated that the City's contribution to the project would be <br /> costs involved with any right of way that may need to be acquired, utility <br /> relocation, and design costs. The local share would be anything that is not funded <br /> by the award from Mn/DOT. <br /> Councilmember Holmes clarified that this project was not expected to have any <br /> costs associated with right of way or utility relocation. The City's portion would <br /> then be the design costs. <br /> Civil Engineer Giga stated that this was correct. <br /> Councilmember Holden asked if there was any way to improve the rail that was <br /> being replaced with a more decorative rail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.