With Changes
<br />(Indicated in Parenthesizes)
<br />Grading Fee — 51 to 100 cubic
<br />Staff costs for reviewing grading }
<br />$30.00
<br />yards
<br />plans and conducting inspections
<br />............................................................nn........................ n n n. .. ..y...
<br />...._..v.................x...N................�...._.. _....._...._... _.._.......................... _............
<br />............................ .......... .. ........... ... ......... ... ........... .............
<br />Grading Fee — 101 to 1,000 cubic
<br />...».......
<br />Staff costs for reviewing grading
<br />$50.00
<br />yards
<br />plans and conducting inspections I
<br />......................................................................................................................................................................2
<br />Grading Fee — 1,001 to 10,000
<br />......................................................................................................................................................................................................................................................
<br />Staff costs for reviewing grading
<br />$75.00
<br />cubic yards
<br />? plans and conducting inspections
<br />...,.,...........,..............,.
<br />...... .. . _.....,.,............._....,......_.,.,,:.,.,..,........».... ..............,....,,,,,
<br />Grading Fee—10,001 or more
<br />..k._.»..........................:...........................»»,....,...,...,..,.,...».».,......»,.........
<br />} Staff costs for reviewing grading
<br />$75.00 for first 10,000 cubic
<br />cubic yards
<br />plans and conducting inspections
<br />yards + $30.00 each additional
<br />t
<br />k
<br />10,000 cubic yards, or faction
<br />3
<br />thereof + additional plan review
<br />fee of $50 per hour (minimum
<br />i
<br />r
<br />i
<br />.........................................................................t...................................................................................................................................................................
<br />charge of half hour)
<br />Appeal of Administrative Zoning,
<br />Cost of staff time to prepare
<br />$75.00 ($100.00)
<br />Sign, or Subdivision Decisions
<br />, appeal information
<br />_......................»,..,.z,.....,_...................,.......».....,,,,...»,.......».w..
<br />,.,,_._...,....,.,,,,...,.,......,.»._..,....._.. .
<br />.: :::.:
<br />t t u es
<br />1:
<br />.::...:::::::
<br />::.:::::.........: ...
<br />::::::::. :..:::::::.::
<br />::.;::::.:::.:::::;:::::. ::
<br />...................... .:....:::.::.: .....::...:::...:::..::....:..
<br />..:::::::::::...:..::.:::::::;:::
<br />..:.::.:
<br />N.......................
<br />Water Permits — Service
<br />................ ...........:: j ..
<br />. ........:...:..........:::..............................:..............w...,..:...................::..:..............:.A...............................,..
<br />(Per inspection)
<br />r.........................,:...............:..........:.........,...:.:......,....,v......v.,.........................................:.......
<br />$37.00 ($38.00)
<br />Installation(/Repairs/Alteration)
<br />k
<br />Water Permits — Interior
<br />$37.00 ($38.00)
<br />Plumbing, New Home
<br />................................ ......... _...._.. .........
<br />....,................................................................................ r.......................................x......
<br />_.........................................................................v......_........................._....
<br />Water Connection Fee, New
<br />........... .....,..,.,..................
<br />s
<br />.. .. ....f...,.
<br />$83.00
<br />Water Turn On/Off, Temporary
<br />.........................................................................................................................................................................................................................................................................................................................................
<br />E
<br />.
<br />$35.00 ($38.00)
<br />.......................................................................
<br />Water Permanent Disconnect
<br />$205.00
<br />Curb Box and Service Lead, 1"
<br />.............................».... ...........
<br />Service Connection on
<br />r
<br />k
<br />Unsurfaced Street
<br />.. ....... .... .....
<br />Restoration of Typical Road Mix
<br />— ------------
<br />$100.00
<br />Street
<br />........ ....... ... ...... ........_ _
<br />Restoration of Higher -Type Street
<br />..... _........ _.... .---------- ..... . ...................
<br />Set by Engineer
<br />.... . ..... . ....................... . ... . . .........
<br />Larger than 1" Service
<br />f
<br />Set by Inspector
<br />Connection
<br />....... ...... ................ ............... .... .. ..................................
<br />......... ......... ......... ......... ......... ...............
<br />Water Permits — Plan Check Fee
<br />_....
<br />Set by Inspector
<br />........ .....I.. ........, ........ I.....,.......... :....-, ......._ ....»...
<br />Water Permits — Re-inspection
<br />*
<br />$37.00 ($38.00 )
<br />........................................................................................................................................................................
<br />Permits — State Surcharge
<br />...................................................................................................................................................................................................................................................................................
<br />............. ...........Water t
<br />$0.50 (.0005 x Project Value or
<br />..................................................................... .......... ......... ..........
<br />..........."'............................ ........... ........... .. .......... ......... ........... ............ ...,,....................
<br />$0.50 whichever is treater)
<br />...............................::......,....:.............�......... ..,. ........».. ..... ....
<br />.....................
<br />Water Meter/Spacer Charges —
<br />k.........
<br />Fee includes removal of meter,
<br />k
<br />$130.00
<br />Customer Requested Water Meter
<br />bench test at maintenance
<br />Accuracy Test
<br />facility, and returning meter to
<br />residence; Fee will not be
<br />applied if the meter is found to
<br />be inaccurate to a degree t
<br />k
<br />exceeding three percent (3%) {
<br />from the result of the bench test
<br />.... .............. ...............................
<br />...................................................... .............
<br />Water Meter/Spacer Charges —
<br />$3 80.00
<br />3 /4" x 7 1 /2" Meter
<br />. .... ......
<br />Water Meter/Spacer Charges —
<br />$405.00
<br />3/4" x 9" Meter
<br />Water Meter/Spacer Charges — 1"
<br />......... .._........ _........ ................... ..._ ..... _
<br />$430.00
<br />Meter
<br />E
<br />Page 6 of 10
<br />
|