Laserfiche WebLink
With Changes <br />(Indicated in Parenthesizes) <br />Grading Fee — 51 to 100 cubic <br />Staff costs for reviewing grading } <br />$30.00 <br />yards <br />plans and conducting inspections <br />............................................................nn........................ n n n. .. ..y... <br />...._..v.................x...N................�...._.. _....._...._... _.._.......................... _............ <br />............................ .......... .. ........... ... ......... ... ........... ............. <br />Grading Fee — 101 to 1,000 cubic <br />...»....... <br />Staff costs for reviewing grading <br />$50.00 <br />yards <br />plans and conducting inspections I <br />......................................................................................................................................................................2 <br />Grading Fee — 1,001 to 10,000 <br />...................................................................................................................................................................................................................................................... <br />Staff costs for reviewing grading <br />$75.00 <br />cubic yards <br />? plans and conducting inspections <br />...,.,...........,..............,. <br />...... .. . _.....,.,............._....,......_.,.,,:.,.,..,........».... ..............,....,,,,, <br />Grading Fee—10,001 or more <br />..k._.»..........................:...........................»»,....,...,...,..,.,...».».,......»,......... <br />} Staff costs for reviewing grading <br />$75.00 for first 10,000 cubic <br />cubic yards <br />plans and conducting inspections <br />yards + $30.00 each additional <br />t <br />k <br />10,000 cubic yards, or faction <br />3 <br />thereof + additional plan review <br />fee of $50 per hour (minimum <br />i <br />r <br />i <br />.........................................................................t................................................................................................................................................................... <br />charge of half hour) <br />Appeal of Administrative Zoning, <br />Cost of staff time to prepare <br />$75.00 ($100.00) <br />Sign, or Subdivision Decisions <br />, appeal information <br />_......................»,..,.z,.....,_...................,.......».....,,,,...»,.......».w.. <br />,.,,_._...,....,.,,,,...,.,......,.»._..,....._.. . <br />.: :::.: <br />t t u es <br />1: <br />.::...::::::: <br />::.:::::.........: ... <br />::::::::. :..:::::::.:: <br />::.;::::.:::.:::::;:::::. :: <br />...................... .:....:::.::.: .....::...:::...:::..::....:.. <br />..:::::::::::...:..::.:::::::;::: <br />..:.::.: <br />N....................... <br />Water Permits — Service <br />................ ...........:: j .. <br />. ........:...:..........:::..............................:..............w...,..:...................::..:..............:.A...............................,.. <br />(Per inspection) <br />r.........................,:...............:..........:.........,...:.:......,....,v......v.,.........................................:....... <br />$37.00 ($38.00) <br />Installation(/Repairs/Alteration) <br />k <br />Water Permits — Interior <br />$37.00 ($38.00) <br />Plumbing, New Home <br />................................ ......... _...._.. ......... <br />....,................................................................................ r.......................................x...... <br />_.........................................................................v......_........................._.... <br />Water Connection Fee, New <br />........... .....,..,.,.................. <br />s <br />.. .. ....f...,. <br />$83.00 <br />Water Turn On/Off, Temporary <br />......................................................................................................................................................................................................................................................................................................................................... <br />E <br />. <br />$35.00 ($38.00) <br />....................................................................... <br />Water Permanent Disconnect <br />$205.00 <br />Curb Box and Service Lead, 1" <br />.............................».... ........... <br />Service Connection on <br />r <br />k <br />Unsurfaced Street <br />.. ....... .... ..... <br />Restoration of Typical Road Mix <br />— ------------ <br />$100.00 <br />Street <br />........ ....... ... ...... ........_ _ <br />Restoration of Higher -Type Street <br />..... _........ _.... .---------- ..... . ................... <br />Set by Engineer <br />.... . ..... . ....................... . ... . . ......... <br />Larger than 1" Service <br />f <br />Set by Inspector <br />Connection <br />....... ...... ................ ............... .... .. .................................. <br />......... ......... ......... ......... ......... ............... <br />Water Permits — Plan Check Fee <br />_.... <br />Set by Inspector <br />........ .....I.. ........, ........ I.....,.......... :....-, ......._ ....»... <br />Water Permits — Re-inspection <br />* <br />$37.00 ($38.00 ) <br />........................................................................................................................................................................ <br />Permits — State Surcharge <br />................................................................................................................................................................................................................................................................................... <br />............. ...........Water t <br />$0.50 (.0005 x Project Value or <br />..................................................................... .......... ......... .......... <br />..........."'............................ ........... ........... .. .......... ......... ........... ............ ...,,.................... <br />$0.50 whichever is treater) <br />...............................::......,....:.............�......... ..,. ........».. ..... .... <br />..................... <br />Water Meter/Spacer Charges — <br />k......... <br />Fee includes removal of meter, <br />k <br />$130.00 <br />Customer Requested Water Meter <br />bench test at maintenance <br />Accuracy Test <br />facility, and returning meter to <br />residence; Fee will not be <br />applied if the meter is found to <br />be inaccurate to a degree t <br />k <br />exceeding three percent (3%) { <br />from the result of the bench test <br />.... .............. ............................... <br />...................................................... ............. <br />Water Meter/Spacer Charges — <br />$3 80.00 <br />3 /4" x 7 1 /2" Meter <br />. .... ...... <br />Water Meter/Spacer Charges — <br />$405.00 <br />3/4" x 9" Meter <br />Water Meter/Spacer Charges — 1" <br />......... .._........ _........ ................... ..._ ..... _ <br />$430.00 <br />Meter <br />E <br />Page 6 of 10 <br />