Laserfiche WebLink
Utilit_y Improvements <br />Watermain <br />Watermain replacement �s recornmenaed on �alentine Court and an Valent�ne Avenue <br />from Valentine Court to O�d Hig�wa� 1 Q. There have been several watermain breaks in <br />this area in �-eeen� years; �the pipe will be replaced with plastic pipe, wh�ch will perform <br />better t��.n iron pipe in �he soils In the area. Replacement of hydrants a�d gate valves is <br />a�so recommended in the Vale�tine neighborhood. No watermain improvements are <br />proposed on Janet �aurt, Katie Lane or �atie Court. <br />San�ta�-y Sewer <br />. <br />No major sanitary sewer improvements are proposed. A few segments of pipe will be <br />replaced in the Va�entlne neighhorhood, where lining or other trenchless techno�og�es <br />cannot be applied because of sags in t�e pipe. Manho�es with structura� deficiencies will <br />be rehabilitated in an effort to reduce inf�ow anc� infiltratian. Chimney seals and solid <br />mar�hole covers will also be plaeed o� aI1 sanitary sewer manholes. <br />Sanitary Sewer services <br />1Vlany of the residents in the Valentine neighborhood have indicated that they have had <br />issues with roots in their sanitary sewer service �ines. The service is the property owner�s <br />responsibil�ty from the main to the hause. Staff recomn�ends including a private sewer <br />service replacement item �or this project. This work would be performec� o�ly if <br />requested and paic� far by t�e proper�y owner. Language could be �ncluded in the <br />eontract documents that the Cont�actor would �rovide unit prices for private work, and <br />that any private work will be done a� a contract between the Contractor and the private <br />property owner. Prov�aing th�s opt�on is intended to maintain the �ntegrity of the newly <br />reconstructed street, as �vell as saving the property owner road restaration eosts in the <br />�uture. <br />Storm Sewer <br />T�e exis�ing storm sewer system v�ill be improved and expanded throughout the <br />ne�ghborhood. Best n�anagemer�� pract2ces, s�ch as rain gardens, In�iltration trenche�, <br />biofiltration basins, and ather feat��-es will also be incorporated i�to �he project in order <br />ta meet the Riee Creek Watershed District's wa�er quality requ�rements. <br />Fin ancial Implications <br />The estimated total project cost for t�ie im�ravements is $1,135,423, Including <br />engineering fees. Consistent with t�e Assessment poliey, an addit�onal 37% overhead for <br />the street improvements has been inc�uded, which was used to calculate prelimina�-y <br />assessment rates. The overhead is broken do�vn as �ollows: <br />C�ty Administratian 2.�% <br />Design Engineering 10.0% <br />Construet�on Engineering � 4.0% <br />Legal 2 . Q°�o <br />�ity Counc�� Meettng <br />\�etro-inet.us\�rc�enhills�'R&PV�\Engineer�ng\�ou�cil_Actions�2014\ � - � 1- l ON1ema_2014�N�P_4rderPlansSpees.doc <br />Page 2 of � <br />