My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Ordinance 2010-002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
02-22-10-R
>
7C, Ordinance 2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:56:12 AM
Creation date
2/22/2010 9:51:06 AM
Metadata
Fields
Template:
General
Document
1296 County Road F
General - Type
Ordinance 2010-002
Date
2/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
recommendations of the Arden Hills Planning Commission, and determined that the <br />proposed CUP: <br />A. Will not have an adverse impact on traffic or parking conditions. <br />B. Will not produce any permanent noise, glare, odors, vibration, smoke, dust, <br />air pollution, heat, liquid or solid waste and other nuisance characteristics. <br />C. Will not impact drainage. <br />D. Will not impact population density. <br />E. It is not expected to increase the visual impact in the area since the tower is <br />already in place and the additional antennas would add minimal bulk to the <br />structure. Additional antennas or changing antenna location should not <br />impact the surrounding propertyvalues. <br />F. Does not conflict with the general purpose and intent of the zoning code or <br />the Comprehensive Development Plan for the City. <br />G. Will not adversely affect the health, safety, convenience and general welfare <br />of the owners and occupants of surrounding properties and the community <br />as a whole. <br />4.0 Cit� Council A��roval. The Arden Hills City Council approved the proposed CUP, <br />subj ect to the following conditions: <br />A. Within forty-five (45) days of approval of the permit, all antennas not in <br />active _use shall be removed from the tower. <br />B. Within forty-five (45) days of the approval of this Conditional Use Permit, US <br />Bank shall submit after-the-fact building permits, supporting information, <br />and fees as required by the building official for any antennas without valid <br />permits issued bythe City. <br />C. Permits for relocating or for adding new antennas or equipment shall not be <br />approved by the City until conditions A and B are completed to the <br />satisfaction of the City. <br />D. Replacing, adding or relocating antennas and equipment on the tower shall <br />require a building permit and structural review by an engineer selected by <br />the City. US Bank shall be responsible for all cost related to the review. The <br />request shall conform to all other City regulations in place at the tirne of the <br />request, unless otherwise provided for in the Conditional Use Permit. All <br />other federal and state regulations shall apply. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.