My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Resolution 2010-010 Ordering Advertisement for 2010 PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
03-08-10-R
>
7C, Resolution 2010-010 Ordering Advertisement for 2010 PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:57:38 AM
Creation date
3/9/2010 9:42:32 AM
Metadata
Fields
Template:
General
Document
Ordering Advertisement for 2010 PMP
General - Type
Resolution 2010-010
Date
3/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Financial Implications <br />The estimated total proj ect cost for the improvements is $1,196,768, including <br />contingency, engineering and overhead fees as outlined in the Assessment Policy. <br />The City's portion of the project costs are currently budgeted from the PIR and Utility <br />Enterprise Funds (sanitary sewer, surface water management and watermain funds). A <br />proj ect cost summary is listed in the table below. The budgeted amount includes total <br />costs programmed in years 2009, 2010 and 2011. Roadway costs include a 37% <br />overhead; utility costs include 30% overhead. <br />Project Cost Summary <br />Fund Budgeted Engineer's Estimate <br />Watermain Enterprise Utility $ 75,000 $ 148,392 <br />Sanitary Sewer Enterprise Utility $ 20,000 $ 139,562 <br />Surface Water Management Utility $ 175,000 $ 167,557 <br />PIR/Assessments $ 532,000 $ 741,257 <br />State Aid (street and storm sewer) $ 300,000 $ 0 <br />Total $ 1,102,000 $ 1,196,769 <br />Amount received from assessments $ 370,629 <br />Amount funded by the City $ 826,139 <br />The watermain and sanitary sewer improvements identified in the feasibility report have a <br />greater estimated cost than what was included in the budget. The City will also need to <br />utilize more funds from the PIR for the roadway improvements, since State Aid funds <br />will not be used on this proj ect. The finance director has indicated that these funds <br />currently have sufficient balances to accommodate the increase. <br />Assessments <br />As detailed in the feasibility report, two preliminary assessment rates have been <br />established, for reconstruction and for mill and overlay. The table below lists the <br />estimated assessment rate per residential equivalent units (REU) based on the latest <br />engineer's estimate. <br />City Council Meeting <br />\�1Vle�ro-inet.us\ardenhills�Admin\Council�Agendas & Packet Information\2010\3-8-10 Regular�Packet Information\7C 3-8- <br />l OMemo_201 OPMP_ApprovePlansSpecs-OrderAdForBid.doc <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.