My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A, Arden Village Development
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
03-08-10-R
>
6A, Arden Village Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:57:34 AM
Creation date
3/9/2010 9:57:33 AM
Metadata
Fields
Template:
General
Document
Arden Village Development
General - Type
Arden Village Development
Date
3/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� t�1�'��JLT'IN� � Y��O►T,?P,, I �t�. <br />E N�IN EER� � P LA.�INER.�; � D E�1GNE`RS. <br />FINAL MEMORANDUM <br />TO: James Lehnhoff, AICP <br />Community Development Director <br />City of Arden Hills <br />FROM : <br />DATE: <br />Craig Vaughn, P.E., P.T.O.E., Senior Associate <br />Matthew Pacyna, P.E., Senior Engineer <br />December 7, 2009 <br />SUBJECT: ARDEN VILLAGE DEVELOPMENT TRAFFIC STUDY <br />INTRODUCTION <br />M<1 N N'`E�4P'OLI � <br />FA RG'C4' <br />A�t:A o i s o N <br />SRF No. 0096985 <br />As requested, a traffic study was completed for the proposed Arden Village development located <br />south of County Road F(CR F) between Hamline Avenue and Lexington Avenue (see Figure 1: <br />Project Location). The purpose of this study is to determine the traffic impacts on the adjacent <br />roadway network related to the proposed development and recommend improvements to provide <br />acceptable intersection operations, if necessary. This study includes an operations analysis <br />during the a.m. and p.m. peak hours of the roadway network for existing and future build <br />conditions, and a review of historical crash information to determine safety issues. <br />The proposed Arden Village development is located south of the Boston Scientific campus <br />(formerly Guidant). A 20-year campus master plan was developed in 2002 to document future <br />additional development on campus and its potential impact on the adj acent roadway network. <br />Therefore, the traffic study conducted and discussed herein includes a separate operations <br />analysis that documents the cumulative impacts from the adj acent development and the proposed <br />Arden Village development. <br />EXISTING CONDITIONS <br />Traffic operations were analyzed at the following key intersections: <br />• County Road F and Hamline Avenue (Southbound) <br />• County Road F and Hamline Avenue (Northbound) <br />• County Road F and Boston Scientific West Driveway <br />• County Road F and Innovation Way <br />• County Road F and Lexington Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.