Laserfiche WebLink
like structure in lieu of a building, it shall be mounted upon <br /> a suitable concrete pad. <br /> 2. If there is an equipment building constructed on site, it <br /> shall be subject to City approval. <br /> 3. To the extent possible, the equipment building or cabinet <br /> shall be located ad j acent to or near existing on-site <br /> buildings. <br /> 4. The equipment building or cabinet shall be screened from <br /> view of adjacent properties by suitable vegetation, except <br /> where non-vegetative screening (e.g., a decorative wall or <br /> fencing) better reflects and complements the character of <br /> the neighborhood. <br /> 5. The City shall require a suitable financial surety to ensure <br /> future removal of the equipment building or cabinet upon <br /> termination of the lease. <br /> 6. All applicants must include a signed report from a State <br /> registered engineer showing compliance with all applicable <br /> codes, standards and structural requirements of how the <br /> additional antennas will affect the water tower structure. A <br /> final inspection report from a State registered engineer <br /> showing the work completed is in compliance with <br /> previously approved plans shall also be required. <br /> Subd. 9 Requirements. <br /> A. A building permit shall be required for all applications except <br /> those as stated in Section 1325.09 Subd I.A. <br /> B. The City shall require the applicant to complete a radio <br /> frequency interference study that is carried out by an independent <br /> and qualified professional reasonably selected by the City that is <br /> able to demonstrate that the applicant's use will not interfere with <br /> any existing communications facilities. <br />