My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1B, 2010 Engineering Work Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
04-19-10-WS
>
1B, 2010 Engineering Work Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 12:16:38 AM
Creation date
4/16/2010 2:15:44 PM
Metadata
Fields
Template:
General
Document
2010 Engineering Work Plan
General - Type
2010 Engineering Work Plan2010 Engineeri
Date
4/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1,I <br /> Physical Demands & Working Conditions: <br /> Most work is in a normal office environment. Limited lifting of twenty five pounds or less is <br /> required up to 15%of the time. Travel within the City or region to view projects or attend meetings <br /> is likely to occur two to three times weekly. There is some exposure to field or construction site <br /> conditions when visiting projects within the City. Occasional attendance at evening Council <br /> meetings and related meetings is required. <br /> The Civil Engineer is responsible for diverse matters, many of which have deadlines and require <br /> significant attention to detail. Up to 45% of the time, work is performed at the highest level of detail <br /> and pressure of deadlines. <br /> e <br /> Y <br /> s5 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.