My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-013
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2000-2009
>
2008
>
2008-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 3:49:49 PM
Creation date
4/20/2010 9:42:37 AM
Metadata
Fields
Template:
General
Document
Ordinance 2008-013
General - Type
Ordinance 2008-013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance 2008-013 <br />arrangement, geometry, massing, materials and colors shall be responsive to existing <br />buildings. The City Council will make the final determination on the compatibility and <br />consistency with this provision. <br />A. Landscaping (Section 1325.05, Subd 1, shall apply) <br />B. Parking (GB District regulations, Section 1320.13, shall apply) <br />C. Signs (GB District regulations, Section 1320.13, shall apply) <br />D. Lighting (GB District regulations, Section 1320.13,) shall apply) <br />E. Pedestrian Circulation: All development within the B-4 District shall <br />incorporate pedestrian improvements, which may include more specific City <br />requirements that become apparent in the plan review process. <br />F. Drainage /Water Management Plan: A plan must be submitted with each <br />project or lot development in the B-4 District. The plan must be approved by <br />the Rice Creek Watershed District, other agencies as required, and by the City <br />Engineer. On -site ponding is encouraged as a visual and functional amenity. <br />Two or more lots or projects may coordinate their plans for their mutual <br />benefit. <br />1320.12 Special Requirements for the I -Flex District. <br />Subd. 1 Procedure. To further accomplish the stated purpose of the I -Flex District, the <br />following procedures shall be used: <br />A. Proposals for new construction, redevelopment of a site, and significant <br />modifications to existing sites shall use the Planned Unit Development <br />(PUD) or the Conditional use Permit (CUP) process. The proposal shall <br />identify any requested modifications from the applicable zoning requirements <br />as well as the reasons.why the modifications would be in the public interest <br />and would be consistent with the purpose of the I -Flex District. <br />Modifications to these requirements may be granted by the City without a <br />variance through the PUD process. Conditional use permits may also be <br />required for uses list in Section 1320.05. <br />B. Conditional Use Permits, Site Plans, and other development agreements <br />that were approved for development sites before December 8, 2008, shall <br />remain in effect. <br />C. The following items shall not be considered significant modifications to <br />an existing site and shall be exempt from the PUD or CUP process but shall <br />be subject to administrative review and approval: <br />
The URL can be used to link to this page
Your browser does not support the video tag.